Wicaksono, Rafael Adhi (2025) EVALUASI DAN OPTIMALISASI DURASI PELAKSANAAN SYSTEM TEST MENGGUNAKAN METODE CRITICAL PATH METHOD DENGAN SOFTWARE POM-QM DI PT PAL INDONESIA. Project Report (Praktek Kerja Lapang). Jurnal Serambi. (Submitted)
![]() |
Text (COVER)
Cover-RafaeL Adhi W-21032010216.pdf Download (597kB) |
![]() |
Text (BAB 1)
BAB 1-RafaeL Adhi W-21032010216.pdf Download (91kB) |
![]() |
Text (BAB 2)
BAB 2-RafaeL Adhi W-21032010216.pdf Download (318kB) |
![]() |
Text (BAB 3)
BAB 3-RafaeL Adhi W-21032010216.pdf Restricted to Repository staff only until 20 June 2028. Download (369kB) |
![]() |
Text (BAB 4)
BAB 4-RafaeL Adhi W-21032010216.pdf Restricted to Repository staff only until 20 June 2028. Download (9kB) |
![]() |
Text (BAB 5)
BAB 5-RafaeL Adhi W-21032010216.pdf Restricted to Repository staff only until 20 June 2028. Download (7kB) |
![]() |
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA-RafaeL Adhi W-21032010216.pdf Download (131kB) |
![]() |
Text (LAMPIRAN)
LAMPIRAN-RafaeL Adhi W-21032010216.pdf Restricted to Repository staff only until 20 June 2028. Download (1MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Rafael Adhi Wicaksono | ||||||||
Date Deposited: | 20 Jun 2025 06:57 | ||||||||
Last Modified: | 20 Jun 2025 06:57 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/38846 |
Actions (login required)
![]() |
View Item |