OPTIMASI KAPASITAS PRODUKSI KOPI BUBUK DENGAN PENDEKATAN THEORY OF CONSTRAINTS (TOC) DI PT. GRAHA REJEKI INDONESIA

Ni'am, Minhajun (2025) OPTIMASI KAPASITAS PRODUKSI KOPI BUBUK DENGAN PENDEKATAN THEORY OF CONSTRAINTS (TOC) DI PT. GRAHA REJEKI INDONESIA. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.

This is the latest version of this item.

[img] Text (Cover)
21032010027.-Cover.pdf

Download (892kB)
[img] Text (Bab 1)
21032010027.-BAB 1.pdf

Download (317kB)
[img] Text (Bab 2)
21032010027.-BAB 2.pdf
Restricted to Repository staff only until 17 June 2027.

Download (528kB)
[img] Text (Bab 3)
21032010027.-BAB 3.pdf
Restricted to Repository staff only until 17 June 2027.

Download (306kB)
[img] Text (Bab 4)
21032010027.-BAB 4.pdf
Restricted to Repository staff only until 17 June 2027.

Download (594kB)
[img] Text (Bab 5)
21032010027.-BAB 5.pdf

Download (229kB)
[img] Text (Daftar Pustaka)
21032010027.-DAFTAR PUSTAKA.pdf

Download (233kB)
[img] Text (Lampiran)
21032010027.-LAMPIRAN.pdf
Restricted to Repository staff only until 17 June 2027.

Download (665kB)

Abstract

PT Graha Rejeki Indonesia is a manufacturing company in Lamongan that produces arabica and robusta ground coffee, the company is facing bottlenecks in its ground coffee production due to an imbalance in machine capacity and cycle time. This causes a buildup of semi-finished goods that can reduce production efficiency and hinder the achievement of production targets. This study applies the Theory of Constraints (TOC) approach to redesign production planning through five steps. Rough Cut Capacity Planning (RCCP) calculations help in determining the work stations that become constraints, namely work stations 2 (roasting) and 4 (finishing). Suggestions for improvements that can be made are to increase working hours at both work stations from March 2024 to February 2025. The improvement has an impact on increasing the production of arabica ground coffee from 7,815kg up 7.42% to 8,395kg and robusta from 6,533kg up 19.69% to 7,819kg. The improvement also had an impact on increasing the amount of company profits from Rp.1,115,060,000 to Rp.1,227,326,000, and the percentage increase in profits increased by 9.2%. With these improvements proven effective in optimizing production capacity and increasing company profits.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSumiati, Sumiati0713126001sumiati.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General)
T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Minhajun Ni'am
Date Deposited: 18 Jun 2025 03:17
Last Modified: 18 Jun 2025 03:17
URI: https://repository.upnjatim.ac.id/id/eprint/38159

Available Versions of this Item

Actions (login required)

View Item View Item