Afif, Syahril Nur Khusna and Ramadhani, Achmad Nur (2025) Laporan Magang Riset MBKM Proyek Package CWI-01: Construction of ITS Tower, CLC And Supporting Infrastructure Institut Teknologi 10 Nopember (ITS) Surabaya. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
COVER.pdf Download (4MB) |
|
|
Text (Bab 1)
BAB 1.pdf Download (3MB) |
|
|
Text (Bab 2)
BAB 2.pdf Download (3MB) |
|
|
Text (Bab 3)
BAB 3.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Bab 4)
BAB 4.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Bab 5)
BAB 5.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Bab 6)
BAB 6.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Bab 7)
BAB 7.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Bab 8)
BAB 8.pdf Restricted to Repository staff only until 27 May 2028. Download (3MB) | Request a copy |
|
|
Text (Daftar pustaka)
daftar pustaka.pdf Download (3MB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
| Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
| Depositing User: | syahril nur khusna afif | ||||||||
| Date Deposited: | 02 Jun 2025 01:59 | ||||||||
| Last Modified: | 02 Jun 2025 01:59 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/36829 |
Actions (login required)
![]() |
View Item |
