Prasetya, Reihan Rafly (2025) Pengendalian Kualitas Pada Proyek Fabrikasi Struktur Conveyor Departemen Konstruksi PT Semen Indonesia Logistik. Project Report (Praktek Kerja Lapang). JKIE (Journal Knowledge Industrial Engineering), Surabaya.
![]() |
Text (cover)
21032010091-cover.pdf Download (368kB) |
![]() |
Text (bab1)
21032010091-bab1.pdf Download (181kB) |
![]() |
Text (bab2)
21032010091-bab2.pdf Restricted to Repository staff only until 14 May 2028. Download (309kB) |
![]() |
Text (bab3)
21032010091-bab3.pdf Restricted to Repository staff only until 14 May 2028. Download (1MB) |
![]() |
Text (bab4)
21032010091-bab4.pdf Restricted to Repository staff only until 14 May 2028. Download (173kB) |
![]() |
Text (bab5)
21032010091-bab5.pdf Download (170kB) |
![]() |
Text (daftarpustaka)
21032010091-daftarpustaka.pdf Download (166kB) |
![]() |
Text (lampiran)
21032010091-lampiran.pdf Restricted to Repository staff only until 14 May 2028. Download (300kB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Reihan Rafly Prasetya | ||||||||
Date Deposited: | 14 May 2025 07:33 | ||||||||
Last Modified: | 14 May 2025 07:33 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/36231 |
Actions (login required)
![]() |
View Item |