PUTRI, SALSA BILA NARIS DANUR (2023) LAPORAN PRAKTIK KERJA LAPANGAN EVALUASI KINERJA KOLOM STRIPPER (C-04) PADA UNIT KILANG PUSAT PENGEMBANGAN SUMBER DAYA MANUSIA (PPSDM MIGAS) CEPU. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
This is the latest version of this item.
![]() |
Text (Cover)
Laporan PKL- Cover.pdf Download (1MB) |
![]() |
Text (Bab 1)
Laporan PKL- BAB I.pdf Download (1MB) |
![]() |
Text (Bab 2)
Laporan PKL - BAB II.pdf Download (1MB) |
![]() |
Text (Bab 3)
Laporan PKL - BAB III.pdf Restricted to Repository staff only until 18 September 2026. Download (1MB) |
![]() |
Text (Bab 4)
Laporan PKL - BAB IV.pdf Restricted to Repository staff only until 18 September 2026. Download (1MB) |
![]() |
Text (Bab 5)
Laporan PKL - BAB V.pdf Restricted to Repository staff only until 18 September 2026. Download (1MB) |
![]() |
Text (Bab 6-8)
Bab 6-8.pdf Restricted to Repository staff only Download (544kB) |
![]() |
Text (Bab 9)
Laporan PKL - BAB IX.pdf Download (1MB) |
![]() |
Text (Bab 10)
Laporan PKL - BAB X.pdf Download (1MB) |
![]() |
Text (Daftar Pustaka)
Laporan PKL - Daftar Pustaka.pdf Download (1MB) |
![]() |
Text (Lampiran)
Laporan PKL - Lampiran.pdf Restricted to Repository staff only Download (3MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
Depositing User: | Salsa Bila Naris Danur Putri | ||||||||
Date Deposited: | 18 Sep 2024 04:25 | ||||||||
Last Modified: | 21 Oct 2024 08:52 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/29405 |
Available Versions of this Item
-
LAPORAN PRAKTIK KERJA LAPANGAN EVALUASI KINERJA KOLOM STRIPPER (C-04) PADA UNIT KILANG PUSAT PENGEMBANGAN SUMBER DAYA MANUSIA (PPSDM MIGAS) CEPU. (deposited 29 Jul 2024 08:11)
- LAPORAN PRAKTIK KERJA LAPANGAN EVALUASI KINERJA KOLOM STRIPPER (C-04) PADA UNIT KILANG PUSAT PENGEMBANGAN SUMBER DAYA MANUSIA (PPSDM MIGAS) CEPU. (deposited 18 Sep 2024 04:25) [Currently Displayed]
Actions (login required)
![]() |
View Item |