ANALISIS RISIKO KECELAKAAN KERJA MENGGUNAKAN METODE BOWTIE PADA PROYEK PEMBANGUNAN RUMAH SAKIT CIPUTRA

Dewi, Risda Yasinta (2024) ANALISIS RISIKO KECELAKAAN KERJA MENGGUNAKAN METODE BOWTIE PADA PROYEK PEMBANGUNAN RUMAH SAKIT CIPUTRA. Undergraduate thesis, UPN VETERAN JAWA TIMUR.

[img] Text (Cover)
20035010057.-cover.pdf

Download (2MB)
[img] Text (Bab 1)
20035010057.-bab1.pdf

Download (327kB)
[img] Text (Bab 2)
20035010057.-bab2.pdf
Restricted to Repository staff only until 31 May 2028.

Download (665kB) | Request a copy
[img] Text (Bab 3)
20035010057.-bab3.pdf
Restricted to Repository staff only until 31 May 2028.

Download (518kB) | Request a copy
[img] Text (Bab 4)
20035010057.-bab4.pdf
Restricted to Repository staff only until 31 May 2028.

Download (1MB) | Request a copy
[img] Text (Bab 5)
20035010057.-bab5.pdf

Download (267kB)
[img] Text (Dapus)
20035010057.-daftarpustaka.pdf

Download (405kB)
[img] Text (Lampiran)
20035010057.-lampiran.pdf
Restricted to Repository staff only until 31 May 2028.

Download (699kB) | Request a copy

Abstract

The condition of work accident risk is a critical factor that needs to be taken seriously. Related to the construction of the Ciputra Hospital Project located on Jl. Made Selatan - Citraland Surabaya, the Ciputra Hospital project is planned to be built on nine floors with a building area of 23,000 m2, which will allow for various occupational accident risks. So, a risk analysis is needed to identify hazards that can occur. In this study, data collection was carried out through interviews and also distribution questionnaires. Questionnaires are used to find probability and severity scales, and questionnaires are distributed to project expert staff. After obtaining the results from the questionnaire, a risk assessment is carried out by finding the probability index and severity index and then determining the category with the risk matrix. After determining the category, the analysis was carried out using the bowtie method. The result of this study is to determine the most dominant risks, namely workers being punctured by sharp equipment when installing formwork, workers falling from a height when installing formwork, and workers being hit by a bar bender machine when forming. After analyzing using the bowtie method, it was found that the causes of the risk of accidents that occurred included workers in a tired condition, lack of concentration, and carelessness, incomplete use of PPE, undisciplined workers at work, no safety at the job site, bad weather, inexperienced workers, poor machine conditions.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman DIta PahangNIDN0717037003UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Risda Yasinta Dewi
Date Deposited: 31 May 2024 04:12
Last Modified: 31 May 2024 04:12
URI: https://repository.upnjatim.ac.id/id/eprint/23673

Actions (login required)

View Item View Item