Analisis Produktivitas Alat Berat pada Proyek Pembangunan Jalan Tol Solo - Yogyakarta - NYIA Kulon Progo Seksi 1 Paket 1.1

Kurniawati, Shevi Adelia Ayu (2024) Analisis Produktivitas Alat Berat pada Proyek Pembangunan Jalan Tol Solo - Yogyakarta - NYIA Kulon Progo Seksi 1 Paket 1.1. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (cover)
19035010116.-cover.pdf

Download (1MB)
[img] Text (Bab 1)
19035010116.-bab1.pdf

Download (130kB)
[img] Text (Bab 2)
19035010116.-bab2.pdf
Restricted to Repository staff only until 30 May 2026.

Download (292kB)
[img] Text (Bab 3)
19035010116.-bab3.pdf
Restricted to Repository staff only until 30 May 2026.

Download (212kB)
[img] Text (Bab 4)
19035010116.-bab4.pdf
Restricted to Repository staff only until 30 May 2026.

Download (751kB)
[img] Text (Bab 5)
19035010116.-bab5.pdf

Download (132kB)
[img] Text (Daftar pustaka)
19035010116.-daftarpustaka.pdf

Download (121kB)
[img] Text (Lampiran)
19035010116.-lampiran.pdf
Restricted to Repository staff only until 26 May 2026.

Download (3MB)

Abstract

The Solo - Yogyakarta - NYIA Kulon Progo Section 1 Package 1.1 toll road construction project in Central Java passes through local settlements so that access to be passed by heavy equipment vehicles will be limited, so this study aims to determine the specifications and productivity of heavy equipment used in STA 14+000 to 15+000 using quantitative descriptive methods. Heavy equipment to be studied are excavators, dump trucks, bulldozer, vibratory roller, sheepfoot roller, and motor grader. Research data is obtained through direct observation and conducting interviews with supervisors in the field. After analyzing the calculations, the results of the production of tools per hour are obtained as follows: dump truck 3,56 m3/hour; excavator 65,94 m3/hour; bulldozer 468 m3/hour; vibratory roller 105,67 m3/hour; sheepfoot roller 105,67 m3/hour; motor grader 156.61 m3/hour. Based on this research, the duration of soil excavation work is 58 days, 60 days of soil backfill work, and 60 days of geotextile and LPA backfill work, then when added up the total duration required for earthworks is 178 days or 5.9 months. This is 2 days faster than the planned time of 180 days. In this research, it was found that the idle time for geotextile work and LPA embankment on the vibratory roller was 7,18 hours and on the motor grader it was 7,44 hours.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman Dita PahangNIDN0717037003UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Shevi Adelia Ayu K
Date Deposited: 30 May 2024 07:50
Last Modified: 30 May 2024 07:50
URI: https://repository.upnjatim.ac.id/id/eprint/23379

Actions (login required)

View Item View Item