Rachmayani, Dewi Novita (2024) Pra Rencana Pabrik Gliserol dari Crude Palm Oil dengan Proses Continuous Fat Splitting”. Undergraduate thesis, UPN Veteran Jawa Timur.
Text (COVER)
19031010130-cover.pdf Download (1MB) |
|
Text (BAB 1)
19031010130-bab1.pdf Download (143kB) |
|
Text (BAB 2)
19031010130-bab2.pdf Download (250kB) |
|
Text (BAB 3)
19031010130-bab3.pdf Restricted to Repository staff only until 18 April 2027. Download (83kB) |
|
Text (BAB 4)
19031010130-bab4.pdf Restricted to Repository staff only until 18 April 2027. Download (118kB) |
|
Text (BAB 5)
19031010130-bab5.pdf Restricted to Repository staff only until 18 April 2027. Download (433kB) |
|
Text (BAB 6)
19031010130-bab6.pdf Restricted to Repository staff only until 18 April 2027. Download (163kB) |
|
Text (BAB 7)
19031010130-bab7.pdf Restricted to Repository staff only until 18 April 2027. Download (773kB) |
|
Text (BAB 8)
19031010130-bab8.pdf Restricted to Repository staff only until 18 April 2027. Download (177kB) |
|
Text (BAB 9)
19031010130-bab9.pdf Restricted to Repository staff only until 18 April 2027. Download (150kB) |
|
Text (BAB 10)
19031010130-bab10.pdf Restricted to Repository staff only until 18 April 2027. Download (267kB) |
|
Text (BAB 11)
19031010130-bab11.pdf Restricted to Repository staff only until 18 April 2027. Download (68kB) |
|
Text (DAFTAR PUSTAKA)
19031010130-daftarpustaka.pdf Download (171kB) |
|
Text (APPENDIX (LAMPIRAN))
19031010130-lampiran.pdf Restricted to Repository staff only until 18 April 2027. Download (5MB) |
|
Text (FLOWSHEET)
19031010130-flowsheet.pdf Download (87kB) |
Abstract
Pre-Plan The Glycerol Factory is planned to be able to produce with a capacity of 60,000 tons/year in liquid form. Glycerol is an important product used in several industries, such as medicines, foodstuffs, cosmetics, toothpaste, lubricants and ceramics. A brief description of the process of the Glycerol factory, namely: Crude Palm Oil and Water raw materials enter the reactor at a temperature of 250 oC, pressure of 50 atm. The glycerol mixture removes the water content using a flash tank. Then the neutralization process uses NaOH to bind the remaining triglycerides in the glycerol mixture. The glycerol mixture is concentrated in an evaporator to reduce the water content so that it is obtained 99% glycerol solution. Glycerol is pumped into the deodoration tank to remove unwanted odors. This pure glycerol is then stored in a glycerol product tank, packaged and ready to be marketed. This factory is planned to be built in 2026. Plan The factory location was established in Tampan, Payung Sekaki District, Pekanbaru City. The provisions for the planned establishment of the Glycerol factory can be summarized as follows: Capacity: 60,000 tons/year Company Form: Limited Liability Company Organizational System: Line and Staff Factory Location: Handsome, Payung Sekaki, Pekanbaru Land area: 22,641 m2 or 2.26 ha Operating System: Continuous Operating Time: 330 days/year; 24 hours/day Number of Employees: 121 People Materials used: Crude Palm Oil, Air, NaOH, Carbon Active
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||
Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
Depositing User: | Dewi Novita Rachmayani | ||||||||
Date Deposited: | 18 Apr 2024 06:28 | ||||||||
Last Modified: | 18 Apr 2024 06:28 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/21740 |
Actions (login required)
View Item |