Anggraeni, Shinta Ristiana (2026) PRA RANCANGAN PABRIK METIL MERKAPTAN DARI SYNGAS DAN HIDROGEN SULFIDA DENGAN CONTINUOUS SYNTHESIS GAS PROCESS KAPASITAS 65.000 TON/TAHUN. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (COVER)
22031010097_COVER TA FIX.pdf Download (1MB) |
|
|
Text (BAB I)
22031010097_BAB I.pdf Download (762kB) |
|
|
Text (BAB II)
22031010097_BAB II.pdf Restricted to Repository staff only Download (821kB) |
|
|
Text (BAB III)
22031010097_BAB III.pdf Restricted to Repository staff only until 28 August 2029. Download (269kB) |
|
|
Text (BAB IV)
22031010097_BAB IV.pdf Restricted to Repository staff only until 28 August 2029. Download (363kB) |
|
|
Text (BAB V)
22031010097_BAB V.pdf Restricted to Repository staff only until 28 August 2029. Download (1MB) |
|
|
Text (BAB VI)
22031010097_BAB VI.pdf Restricted to Repository staff only until 28 August 2029. Download (653kB) |
|
|
Text (BAB VII)
22031010097_BAB VII_UTILITAS.pdf Restricted to Repository staff only until 28 August 2029. Download (409kB) |
|
|
Text (BAB VIII)
22031010097_BAB VIII.pdf Restricted to Repository staff only until 28 August 2029. Download (862kB) |
|
|
Text (BAB IX)
22031010097_BAB IX.pdf Restricted to Repository staff only until 28 August 2029. Download (664kB) |
|
|
Text (BAB X)
22031010097_BAB X.pdf Restricted to Repository staff only until 28 August 2029. Download (705kB) |
|
|
Text (BAB XI)
22031010097_BAB XI.pdf Restricted to Repository staff only until 28 August 2029. Download (426kB) |
|
|
Text (DAFTAR PUSTAKA)
22031010097_DAFTAR PUSTAKA.pdf Download (647kB) |
|
|
Text (FLOWSHEET)
FLOWSHEET.pdf Download (342kB) |
Abstract
The growing demand for methyl mercaptan used as a raw material for methionine, pesticides, and various other chemical products has created a need to establish a methyl mercaptan plant in Indonesia to meet domestic requirements and reduce import dependency. Currently, domestic demand is met entirely through imports, as there are no local facilities producing methyl mercaptan on a commercial scale. This preliminary design outlines a methyl mercaptan plant with a capacity of 65,000 tons per year, utilizing the Continuous Synthesis Gas Process. The production process involves several key stages: the preparation of syngas and H₂S raw materials; a synthesis reaction within a multitubular fixed-bed reactor at approximately 280°C; and subsequent cooling, condensation, and separation steps to obtain the CH₃SH product. CO₂ and H₂S gases are separated using a scrubber with a Monoethanolamine (MEA) solution, while stripped gases and unreacted syngas are recycled back to the reactor. The CH₃SH product undergoes further purification including flash separation, decantation, and additional separation stages before being routed to storage tanks. The preliminary design indicates that the methyl mercaptan synthesis process is viable for implementation, as it employs commercially proven technology and benefits from the availability of syngas and H₂S raw materials, as well as a strategic plant location in Bontang, East Kalimantan. Economic analysis suggests the project is a promising venture, offering an adequate profit margin and a relatively short payback period.
| Item Type: | Thesis (Undergraduate) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Shinta Ristiana Anggraeni | ||||||||
| Date Deposited: | 31 Aug 2026 02:43 | ||||||||
| Last Modified: | 31 Aug 2026 03:51 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/59155 |
Actions (login required)
![]() |
View Item |
