Wahyono, Qhintara (2026) KAJIAN RISIKO KEBERLANJUTAN PADA RANTAI PASOK UNTUK MENDUKUNG PENINGKATAN SUPPLY CHAIN RESILIENCE MENGGUNAKAN METODE HOUSE OF RISK (HOR) DAN INTERPRETIVE STRUCTURAL MODELING (ISM) DI PT XYZ. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.
|
Text (Cover)
22032010141-cover.pdf Download (1MB) | Preview |
|
|
Text (Bab 1)
22032010141-bab1.pdf Download (344kB) | Preview |
|
|
Text (Bab 2)
22032010141-bab2.pdf Restricted to Repository staff only until 29 May 2029. Download (652kB) |
||
|
Text (Bab 3)
22032010141-bab3.pdf Restricted to Repository staff only until 29 May 2029. Download (297kB) |
||
|
Text (Bab 4)
22032010141-bab4.pdf Restricted to Repository staff only until 29 May 2029. Download (1MB) |
||
|
Text (Bab 5)
22032010141-bab5.pdf Download (200kB) | Preview |
|
|
Text (Daftar Pustaka)
22032010141-daftarpustaka.pdf Download (189kB) | Preview |
|
|
Text (Lampiran)
22032010141-lampiran.pdf Restricted to Repository staff only until 29 May 2029. Download (979kB) |
Abstract
Supply chain activities in the shipbuilding industry have high complexity that may generate sustainability risks and affect supply chain resilience. This study aims to assess sustainability risks in the supply chain of PT XYZ and formulate strategies to improve supply chain resilience using the House of Risk (HOR) and Interpretive Structural Modeling (ISM) methods. HOR Phase 1 identified 24 risk events and 30 risk agents, with the dominant risks consisting of design changes after material list approval (RA3) with an ARP value of 945, project completion pressure (RA21) with an ARP value of 860, and delays in delivery and customs clearance of imported main engines (RA9) with an ARP value of 609. HOR Phase 2 produced eight priority mitigation strategies, with the highest ETDₖ values on PA10 at 3846.67, PA1 at 3435.75, and PA4 at 2409. ISM–MICMAC results showed six driver elements, with the highest driving power found in Knowledge at 13, followed by Visibility, Risk Management Culture, and Trust at 12, as well as Collaboration and Information Sharing at 10. The synthesis of HOR and ISM resulted in supply chain resilience improvement strategies through the pre-disruption, during disruption, and post-disruption phases focusing on strengthening risk control, cross-divisional coordination, information visibility, and continuous learning at PT XYZ.
| Item Type: | Thesis (Undergraduate) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||||||
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management |
||||||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||||||
| Depositing User: | Qhintara Wahyono | ||||||||||||
| Date Deposited: | 29 May 2026 08:49 | ||||||||||||
| Last Modified: | 29 May 2026 08:49 | ||||||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/53233 |
Actions (login required)
![]() |
View Item |
