Sakiyatuddurriyah, Sakiyatuddurriyah EVALUASI PENGARUH CEDERA OPERATOR DENGAN PENDEKATAN NORDIC BODY MAP DAN RAPID ENTIRE BODY ASSESSMENT DI PT. EFG. Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional "Veteran" Jawa Timur. (Unpublished)
|
Text (Cover)
22032010019 - cover.pdf Download (238kB) | Preview |
|
|
Text (Bab 1)
22032010019 - bab1.pdf Download (115kB) | Preview |
|
|
Text (Bab 2)
22032010019 - bab2.pdf Restricted to Repository staff only until 24 May 2029. Download (282kB) |
||
|
Text (Bab 3)
22032010019 - bab3.pdf Restricted to Repository staff only until 24 May 2029. Download (356kB) |
||
|
Text (Bab 4)
22032010019 - bab4.pdf Restricted to Repository staff only until 24 May 2029. Download (109kB) |
||
|
Text (Bab 5)
22032010019 - bab5.pdf Download (77kB) | Preview |
|
|
Text (Daftar Pustaka)
22032010019 - daftarpustaka.pdf Download (103kB) | Preview |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TA Engineering (General). Civil engineering (General) T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Sakiya tud durriyah | ||||||||
| Date Deposited: | 26 May 2026 02:42 | ||||||||
| Last Modified: | 26 May 2026 02:42 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/52319 |
Actions (login required)
![]() |
View Item |
