PERANCANGAN ULANG TATA LETAK CONTAINER YARD MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) DI PT XYZ

Adelencia, Vallent Arfi (2026) PERANCANGAN ULANG TATA LETAK CONTAINER YARD MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) DI PT XYZ. Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img]
Preview
Text (Cover)
22032010194-Cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
22032010194-bab 1.pdf

Download (471kB) | Preview
[img] Text (Bab 2)
22032010194-bab 2.pdf
Restricted to Repository staff only until 30 April 2029.

Download (745kB) | Request a copy
[img] Text (Bab 3)
22032010194-bab 3.pdf
Restricted to Repository staff only until 30 April 2029.

Download (304kB) | Request a copy
[img] Text (Bab 4)
22032010194-bab 4.pdf
Restricted to Repository staff only until 30 April 2029.

Download (2MB) | Request a copy
[img]
Preview
Text (Bab 5)
22032010194-bab 5.pdf

Download (274kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
22032010194-daftarpustaka.pdf

Download (255kB) | Preview
[img] Text (Lampiran)
22032010194-lampiran.pdf
Restricted to Repository staff only until 30 April 2029.

Download (769kB) | Request a copy

Abstract

The increasing container traffic demands optimal container yard management to support loading and unloading efficiency. PT XYZ Surabaya faces challenges with an inefficiently arranged container yard Layout. Field observations reveal a total travel distance of 401.35 meters characterized by backtracking, cross movement, and non-linear flow, particularly in the CY Entry–Gate Out segment spanning 230.15 meters. This condition causes extended dwelling time and decreased operational productivity. This study aims to design a more efficient Layout using the Systematic Layout Planning (SLP) method through Flow Process Chart (FPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), and optimization using WINQSB software. Results show the proposed Layout successfully reduces travel distance from 401.35 meters to 376.91 meters 6.01% improvement, with the CY Entry–Gate Out segment reduced to 221.46 meters. The proposed Layout eliminates backtracking and cross movement, creating a more systematic material flow. The SLP method application proves effective in enhancing operational efficiency without requiring area expansion or new infrastructure investment.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSaifuddin, Joumil AidilNIDN0718036203joumilaidil.ti@upnjatim.ac.id
Subjects: T Technology > TS Manufactures
T Technology > TS Manufactures > TS 180-TS180.8 Material Handling
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Vallent Arfi Adelencia
Date Deposited: 30 Apr 2026 08:22
Last Modified: 30 Apr 2026 08:45
URI: https://repository.upnjatim.ac.id/id/eprint/51440

Actions (login required)

View Item View Item