Erzon, Elvi Anggino (2025) Optimalisasi Alur Kerja Pengambilan Material Processor dengan Metode Lean Manufacturing Pada PT. DSV. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.
This is the latest version of this item.
|
Text (Cover)
21032010181-cover.pdf Download (642kB) |
|
|
Text (Bab 1)
21032010181-bab1.pdf Download (225kB) |
|
|
Text (Bab 2)
21032010181-bab2.pdf Restricted to Repository staff only until 4 December 2028. Download (274kB) |
|
|
Text (Bab 3)
21032010181-bab3.pdf Restricted to Repository staff only until 4 December 2028. Download (440kB) |
|
|
Text (Bab 4)
21032010181-bab4.pdf Download (208kB) |
|
|
Text (Bab 5)
21032010181-bab5.pdf Download (183kB) |
|
|
Text (Daftar Pustaka)
21032010181-daftarpustaka.pdf Download (171kB) |
|
|
Text (Lampiran)
21032010181-lampiran.pdf Restricted to Repository staff only until 22 December 2028. Download (241kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD30.213 Decision Support Systems H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Elvi Anggino Erzon | ||||||||
| Date Deposited: | 22 Dec 2025 08:02 | ||||||||
| Last Modified: | 22 Dec 2025 08:13 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/48479 |
Available Versions of this Item
-
Optimalisasi Alur Kerja Pengambilan
Material Processor dengan Metode
Lean Manufacturing Pada PT. DSV. (deposited UNSPECIFIED)
- Optimalisasi Alur Kerja Pengambilan Material Processor dengan Metode Lean Manufacturing Pada PT. DSV. (deposited 22 Dec 2025 08:02) [Currently Displayed]
Actions (login required)
![]() |
View Item |
