METODE PELAKSAAN KONTRUKSI PADA PROYEK JALAN TOL PASURUAN – PROBOLINGGO SEKSI 4 STA 31+500 – STA 04+050 KAB. PROBOLINGGO, JAWA TIMUR

Alaik, Achmad Rodhiyan and Fahmi, Muhammad Naufal (2025) METODE PELAKSAAN KONTRUKSI PADA PROYEK JALAN TOL PASURUAN – PROBOLINGGO SEKSI 4 STA 31+500 – STA 04+050 KAB. PROBOLINGGO, JAWA TIMUR. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.

[img] Text (Cover)
19035010088-cover.pdf

Download (508kB)
[img] Text (Bab 1)
19035010088-bab 1.pdf

Download (185kB)
[img] Text (Bab 2)
19035010088-bab 2.pdf
Restricted to Repository staff only until 4 December 2028.

Download (545kB)
[img] Text (Bab 3)
19035010088-bab 3.pdf
Restricted to Repository staff only until 4 December 2028.

Download (158kB)
[img] Text (Bab 4)
19035010088-bab 4.pdf
Restricted to Repository staff only until 4 December 2028.

Download (1MB)
[img] Text (Bab 5)
19035010088-bab 5.pdf
Restricted to Repository staff only until 4 December 2028.

Download (928kB)
[img] Text (Bab 6)
19035010088-bab 6.pdf

Download (71kB)
[img] Text (Daftar Pustaka)
19035010088-daftar pustaka.pdf

Download (7kB)
[img] Text (Lampiran)
19035010088-lampiran.pdf
Restricted to Repository staff only until 4 December 2028.

Download (987kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorEstikhamah, FithriNIDN0014068404fithri.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Achmd Rodhiyan Alaik
Date Deposited: 23 Dec 2025 03:04
Last Modified: 23 Dec 2025 03:37
URI: https://repository.upnjatim.ac.id/id/eprint/47987

Actions (login required)

View Item View Item