ANALISA PENJADWALAN WAKTU PROYEK MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM)

Idris, Mukandar (2025) ANALISA PENJADWALAN WAKTU PROYEK MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM). Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.

[img] Text (Cover)
21032010209-cover.pdf.pdf

Download (507kB)
[img] Text (Bab 1)
21032010209-bab1.pdf.pdf

Download (126kB)
[img] Text (Bab 2)
21032010209-bab2.pdf.pdf
Restricted to Repository staff only until 3 December 2027.

Download (140kB) | Request a copy
[img] Text (Bab 3)
21032010209-bab3.pdf.pdf
Restricted to Repository staff only until 3 December 2027.

Download (305kB) | Request a copy
[img] Text (Bab 4)
21032010209-bab4.pdf.pdf

Download (16kB)
[img] Text (Bab 5)
21032010209-bab5.pdf.pdf

Download (11kB)
[img] Text (Daftar Pustaka)
21032010209-daftarpustaka.pdf.pdf

Download (103kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorCattleya Prameswari A, MegaNIDN0012119204mega.cattleya.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning
H Social Sciences > HD Industries. Land use. Labor > HD62.15 Total Quality Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Mukandar Idris
Date Deposited: 22 Dec 2025 08:49
Last Modified: 23 Dec 2025 02:24
URI: https://repository.upnjatim.ac.id/id/eprint/47721

Actions (login required)

View Item View Item