Analisis Pengaruh Faktor Kritis terhadap Kinerja Proyek Konstruksi pada CV Adhi Citra Haryo Seto

Seto, Adhimas Kunto Haryo (2025) Analisis Pengaruh Faktor Kritis terhadap Kinerja Proyek Konstruksi pada CV Adhi Citra Haryo Seto. Masters thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
23061020023.-cover.pdf

Download (870kB)
[img] Text (BAB I)
23061020023.-bab1.pdf

Download (140kB)
[img] Text (BAB II)
23061020023.-bab2.pdf
Restricted to Repository staff only until 20 October 2027.

Download (295kB)
[img] Text (BAB III)
23061020023.-bab3.pdf
Restricted to Repository staff only until 20 October 2027.

Download (198kB)
[img] Text (BAB IV)
23061020023.-bab4.pdf
Restricted to Repository staff only until 20 October 2027.

Download (499kB)
[img] Text (BAB V)
23061020023,-bab5.pdf

Download (43kB)
[img] Text (Daftar Pustaka)
23061020023.-daftarpustaka.pdf

Download (179kB)
[img] Text (LAMPIRAN)
23061020023.-lampiran.pdf
Restricted to Repository staff only until 20 October 2027.

Download (457kB)

Abstract

Construction projects often face challenges in meeting cost, time, and quality targets. This study aims to analyze, the effect of top management support as a critical factor on project performance, the effect of project team competence as a critical factor on project performance, the effect of green project practices as a critical factor on project performance, and the mediating role of project management effectiveness in these relationships. The research was conducted at CV Adhi Citra Haryo Seto, which managed seven projects during 2023–2025, involving 103 project personnel as respondents. Data were collected using questionnaires and analyzed using Partial Least Squares Structural Equation Modeling (PLS-SEM) in SmartPLS 4. The findings indicate that project performance at CV Adhi Citra Haryo Seto improves when top management provides consistent support, project teams demonstrate adequate competencies, and green project practices are effectively implemented. These three factors are reinforced through project management effectiveness, where well-prepared planning, structured coordination, and responsive control serve as the bridge that translates leadership support, team capabilities, and green project practices into tangible achievements in cost, time, quality, and project sustainability. Keywords: critical factors and project performance.

Item Type: Thesis (Masters)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorAnwar, MuhadjirNIDN0007096508muhadjira.ma@upnjatim.ac.id
Thesis advisorWaluyo, MintoNIDN0730116101mintow.ti@upnjatim.ac.id
Subjects: T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Economic and Business > Magister Management
Depositing User: Mr Adhimas Kunto Haryo Seto
Date Deposited: 20 Oct 2025 08:16
Last Modified: 20 Oct 2025 08:16
URI: https://repository.upnjatim.ac.id/id/eprint/45657

Actions (login required)

View Item View Item