Perhitungan Kebutuhan Energi untuk Memanaskan Nira di Stasiun Pemurnian dari Mesin Boiler di PT PG Candi Baru

Yusuf, Mochammad (2024) Perhitungan Kebutuhan Energi untuk Memanaskan Nira di Stasiun Pemurnian dari Mesin Boiler di PT PG Candi Baru. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa TImur. (Unpublished)

[img] Text (Cover)
21031010233-COVER.pdf

Download (962kB)
[img] Text (BAB I)
21031010233-BAB I.pdf

Download (344kB)
[img] Text (BAB II)
21031010233-BAB II.pdf

Download (286kB)
[img] Text (BAB III)
21031010233-BAB III.pdf
Restricted to Repository staff only until 13 September 2028.

Download (505kB)
[img] Text (BAB IV)
21031010233-BAB IV.pdf
Restricted to Repository staff only until 13 September 2028.

Download (768kB)
[img] Text (BAB V)
21031010233-BAB V.pdf
Restricted to Repository staff only until 13 September 2028.

Download (315kB)
[img] Text (BAB VI)
21031010233-BAB VI.pdf
Restricted to Repository staff only until 13 September 2028.

Download (291kB)
[img] Text (BAB VII)
21031010233-BAB VII.pdf
Restricted to Repository staff only until 13 September 2028.

Download (185kB)
[img] Text (BAB VIII)
21031010233-BAB VIII.pdf
Restricted to Repository staff only until 13 September 2028.

Download (458kB)
[img] Text (BAB IX)
21031010233-BAB IX.pdf
Restricted to Repository staff only until 13 September 2028.

Download (555kB)
[img] Text (DAFTAR PUSTAKA)
21031010233-DAFTAR PUSTAKA.pdf

Download (240kB)
[img] Text (LAMPIRAN)
21031010233-LAMPIRAN.pdf
Restricted to Repository staff only until 13 September 2028.

Download (1MB)

Abstract

Field Work Practice Activities at PG Candi Bar, took place from September 2 to September 30, 2024. The purpose of this internship was to understand real-world industrial conditions and to be able to apply the knowledge that has been taught, particularly within the sugar industry. PG Candi Baru’s sugar production process is divided into several stations: the Milling Station, Clarification Station, Evaporation Station, Crystallization Station, and Centrifugal Station During the internship, several tasks were assigned, including weekly and special assignments. The weekly assignments consisted of designing equipment plans, understanding the production process flow, and conducting direct data observation. The special assignment involved calculating the energy requirements for the boiler machine at the Clarification Station. The goal of these tasks was to allow students to get to know, communicate, and understand both the process and the utilities at PG Candi Baru.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorEdahwati, LulukNIDN0011066407UNSPECIFIED
Subjects: Q Science > QD Chemistry
T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Mochammad Yusuf
Date Deposited: 15 Sep 2025 06:49
Last Modified: 15 Sep 2025 06:49
URI: https://repository.upnjatim.ac.id/id/eprint/43229

Actions (login required)

View Item View Item