PROYEK PEMBANGUNAN GEDUNG JI’RONA RUMAH SAKIT ‘AISYIYAH BOJONEGORO

Satriawan, Earlangga Rohmat (2025) PROYEK PEMBANGUNAN GEDUNG JI’RONA RUMAH SAKIT ‘AISYIYAH BOJONEGORO. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img] Text (Cover)
21035010042.-cover.pdf

Download (1MB)
[img] Text (BAB I)
21035010042.-bab 1.pdf

Download (374kB)
[img] Text (BAB II)
21035010042.-bab 2.pdf
Restricted to Repository staff only until 23 July 2027.

Download (3MB)
[img] Text (BAB III)
21035010042.-bab 3.pdf
Restricted to Repository staff only until 23 July 2027.

Download (662kB)
[img] Text (BAB IV)
21035010042.-bab 4.pdf
Restricted to Repository staff only until 23 July 2027.

Download (7MB)
[img] Text (BAB V)
21035010042.-bab 5.pdf
Restricted to Repository staff only until 23 July 2027.

Download (1MB)
[img] Text (BAB VI)
21035010042.-bab 6.pdf

Download (249kB)
[img] Text (Daftar Pustaka)
21035010042.-daftarpustaka.pdf

Download (182kB)
[img] Text (LAMPIRAN)
21035010042.-lampiran.pdf
Restricted to Repository staff only until 23 July 2027.

Download (3MB)

Abstract

A building is a physical form of construction work that is integrated with its location, partially or wholly above and/or in the ground and/or air, which functions as a place for humans to carry out their activities. One of them is the hospital building which is used to support Health Facilities. 'Aisyiyah Bojonegoro Hospital is one of the hospitals located in Bojonegoro City, East Java. 'Aisyiyah Bojonegoro Hospital is one of the hospitals under the auspices of the Muhammadiyah foundation. 'Aisyiyah Bojonegoro Hospital has 4 main buildings, namely the 3-story Arofah Building (2002), the 4-story Bir 'Ali Building (2009), the 5-story Tan'im Building (2019), and the 7-story Ji'rona Building which is under construction in 2024. The Ji'rona Building Construction Project of 'Aisyiyah Bojonegoro Hospital was carried out, as one of the continuations of the strategic plan for the construction of 'Aisyiyah Bojonegoro Hospital. The Ji'rona Building will be built in Bojonegoro City Center on Jl. KH. Hasyim Asy'ari No. 17, Kauman, Bojonegoro District, Bojonegoro Regency/City, East Java. The Ji'rona Building will be built on 7 floors with a building area of 11,633 m2, on an area of 2,930 m2. With the continuation of the strategic plan for the construction of 'Aisyiyah Bojonegoro Hospital, it is hoped that it can make it easier for the surrounding community to access treatment so that the goal of improving public health services can be achieved. The Ji'rona Building will be built by prioritizing the futuristic concept and green hospital building which is expected to become an iconic building in Bojonegoro City. The Ji'rona Building Construction Project of 'Aisyiyah Bojonegoro Hospital is in line with Sustainable Development Goals (SDGs) Number 3, which is to ensure healthy living and promote welfare for all. By providing better access to quality health services, the construction of this new building contributes to improving the quality of life of the community and is expected to reduce the death rate due to diseases. In addition, the construction of this new hospital building can also create new jobs and encourage local economic growth.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSumaidi, SumaidiNIDN0707097901sumaidi.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Earlangga Rohmat Satriawan
Date Deposited: 24 Jul 2025 01:43
Last Modified: 24 Jul 2025 01:43
URI: https://repository.upnjatim.ac.id/id/eprint/40673

Actions (login required)

View Item View Item