Analisis Success Factor Sistem Manajemen Swakelola Dengan Metode AHP Pada Proyek Konstruksi Bangunan Gedung Ji’rona Rumah Sakit ‘Aisyiyah Bojonegoro

Satriawan, Earlangga Rohmat (2025) Analisis Success Factor Sistem Manajemen Swakelola Dengan Metode AHP Pada Proyek Konstruksi Bangunan Gedung Ji’rona Rumah Sakit ‘Aisyiyah Bojonegoro. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
21035010042.-cover.pdf

Download (1MB)
[img] Text (BAB I)
21035010042.-bab 1.pdf

Download (260kB)
[img] Text (BAB II)
21035010042.-bab 2.pdf
Restricted to Repository staff only until 23 July 2027.

Download (381kB)
[img] Text (BAB III)
21035010042.-bab 3.pdf
Restricted to Repository staff only until 23 July 2027.

Download (549kB)
[img] Text (BAB IV)
21035010042.-bab 4.pdf
Restricted to Repository staff only until 23 July 2027.

Download (1MB)
[img] Text (BAB V)
21035010042.-bab 5.pdf

Download (248kB)
[img] Text (Daftar Pustaka)
21035010042.-daftarpustaka.pdf

Download (228kB)
[img] Text (LAMPIRAN)
21035010042.-lampiran.pdf
Restricted to Repository staff only until 23 July 2027.

Download (8MB)

Abstract

Construction projects require an effective and efficient project management system to achieve the expected development goals. One of the developments in project management is the production of a self-managed project management system, which is a management system that the project owner manages by prioritizing the use of their resources. This study aims to determine the priority scale of the factors and criteria for self-management success in the Ji’rona Building Construction Project of ‘Aisyiyah Bojonegoro Hospital. The Ji’rona Building will be built on seven floors, with a building area of 11,633 m2 and an area of 2,930 m2. The data collection technique used a quantitative descriptive questionnaire survey in this study. The study involved 24 respondents, including project owners, planning teams, implementation teams, supervisory teams/CM, and self-management expert respondents. The data analysis method uses the AHP (Analytical Hierarchy Process) method to make it easier to make decisions based on several alternative self-management success factors. Based on the results of data analysis, the research identified the results of ranking criteria and subcriteria in the form of a diagram, as well as changes in the hierarchical structure of the research on the success factors of self-management success. The study concluded that the priority weight factors for the success of self-management in the Ji’rona RSAB Building Construction Project were quality 0.124, communication 0.120, risk management 0.116, stakeholder satisfaction 0.111, cost 0.110, administration 0.108, resources 0.107, time 0.101, and characteristics of the place 0.089.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman Dita PahangNIDN0717037003putra_indp.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Earlangga Rohmat Satriawan
Date Deposited: 24 Jul 2025 01:41
Last Modified: 24 Jul 2025 01:42
URI: https://repository.upnjatim.ac.id/id/eprint/40665

Actions (login required)

View Item View Item