Utami, Imanda Prasetya (2025) Analisis Kelayakan Finansial Pada Proyek Pembangunan Gedung Bertingkat (Studi Kasus: Pembangunan Gedung Center for Language and Culture Di Kota Surabaya). Undergraduate thesis, UPN "VETERAN" JAWA TIMUR.
![]() |
Text (Cover)
21035010024.-cover.pdf Download (3MB) |
![]() |
Text (Bab 1)
21035010024.-bab1.pdf Download (1MB) |
![]() |
Text (Bab 2)
21035010024.-bab2.pdf Restricted to Repository staff only until 13 July 2027. Download (1MB) |
![]() |
Text (Bab 3)
21035010024.-bab3.pdf Restricted to Repository staff only until 13 July 2027. Download (711kB) |
![]() |
Text (Bab 4)
21035010024.-bab4.pdf Restricted to Repository staff only until 13 July 2027. Download (6MB) |
![]() |
Text (Bab 5)
21035010024.-bab5.pdf Download (291kB) |
![]() |
Text (Daftar Pustaka)
21035010024.-daftarpustaka.pdf Download (567kB) |
![]() |
Text (Lampiran)
21035010024.-lampiran.pdf Restricted to Repository staff only Download (780kB) |
Abstract
The rapid population growth in Indonesia, accompanied by significant developments in the education sector, has driven the demand for educational facilities. One possible initiative to address this need is the construction of a Center for Language and Culture building. However, before proceeding with the construction, a financial feasibility study should be conducted beforehand. Therefore, this research aims to ensure that the construction project is financially viable and to mitigate potential future losses. The investment cost for this development amounts to IDR8,471,001,782.06, funded through a grant from the ASEAN Development Bank (ADB). The research employs the Discounted Cash Flow (DCF) method, utilizing NPV, IRR, BCR, ROI, BEP, and Payback Period as feasibility parameters. The required data includes building construction planning and operational data. The analysis results indicate a positive NPV of IDR15.312.986.696,52, an IRR of 28.19%, a BCR of 2.47, and an ROI of 34.73%. The Break-Even Point (BEP) occurs in the second year, in the ninth month, while the Payback Period is 3 years and 8 months. These findings confirm that the project is financially feasible and suitable for implementation.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
Depositing User: | Imanda Prasetya Utami | ||||||||
Date Deposited: | 15 Jul 2025 03:18 | ||||||||
Last Modified: | 15 Jul 2025 03:18 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/39436 |
Actions (login required)
![]() |
View Item |