Aditya, Dewi Mardiana (2025) Analisis Efektivitas Penggunaan Alat Berat Excavator Berbasis Hours Meter (HM) Menggunakan Metode Overall Equipment Effectivenes (OEE) Dan Six Big Losses Di PT. Uniteda Arkato Site Banyuwangi. Project Report (Praktek Kerja Lapang). Jurnal Teknik Industri Terintegrasi (JUTIN), Surabaya. (Unpublished)
![]() |
Text (Cover)
21032010009.-cover.pdf Download (232kB) |
![]() |
Text (Bab 1)
21032010009.-bab1.pdf Download (53kB) |
![]() |
Text (Bab 2)
21032010009.-bab2.pdf Download (1MB) |
![]() |
Text (Bab 3)
21032010009.-bab3.pdf Restricted to Repository staff only until 19 June 2028. Download (231kB) |
![]() |
Text (Bab 4)
21032010009.-bab4.pdf Restricted to Repository staff only until 19 June 2028. Download (24kB) |
![]() |
Text (Bab 5)
21032010009.-bab5.pdf Restricted to Repository staff only until 19 June 2028. Download (22kB) |
![]() |
Text (Lampiran)
21032010009.-lampiran.pdf Restricted to Repository staff only until 19 June 2028. Download (167kB) |
Abstract
PT. Uniteda Arkato is a company engaged in heavy equipment rental and contractors. The problem of suboptimal unit performance occurs in one of the excavators owned by the company, namely the Komatsu PC 300 Bucket Excavator. This study aims to identify the effectiveness of excavator use and minimize losses during the production process. The methods used in this study are Overall Equipment Effectiveness (OEE) and Six Big Losses. The results showed that the OEE Excavator was still below world standards, which was 77% with an Availability value of 88%, Performance Efficiency of 93%, and Rate of Quality of 94%. Furthermore, based on the Six Big Losses analysis, the largest losses occurred due to the Reduce Speed Losses factor, which was 34%, which was caused by large downtime. Several recommendations for improvement were proposed to improve unit effectiveness such as setting maintenance schedules, inspections and component replacements, and operator training. This study is expected to contribute to improving the effectiveness of unit use and company productivity.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Dewi Mardiana Aditya | ||||||||
Date Deposited: | 20 Jun 2025 07:24 | ||||||||
Last Modified: | 20 Jun 2025 07:24 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/38667 |
Actions (login required)
![]() |
View Item |