IDENTIFIKASI WASTE PADA BATU DOLOMIT DENGAN METODE WASTE ASSESSMENT MODEL (WAM) DALAM PENERAPAN LEAN MANUFACTURING DI PT XYZ

Saliem, Muhammad Niqey Dzi Qolbin Saliem (2025) IDENTIFIKASI WASTE PADA BATU DOLOMIT DENGAN METODE WASTE ASSESSMENT MODEL (WAM) DALAM PENERAPAN LEAN MANUFACTURING DI PT XYZ. Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img] Text (Cover)
Cover.pdf

Download (2MB)
[img] Text (Bab 1)
2. Bab I.pdf

Download (348kB)
[img] Text (Bab 2)
3. Bab II.pdf
Restricted to Repository staff only until 17 June 2027.

Download (950kB)
[img] Text (Bab 3)
4. Bab III.pdf
Restricted to Repository staff only until 17 June 2027.

Download (368kB)
[img] Text (Bab 4)
5. Bab IV.pdf
Restricted to Repository staff only until 17 June 2027.

Download (1MB)
[img] Text (Bab 5)
6. Bab V.pdf

Download (280kB)
[img] Text (Daftar Pustaka)
7. Daftar Pustaka.pdf

Download (246kB)
[img] Text (Lampiran)
8. Lampiran.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Production plays an important role in maintaining the quality and quantity of products until they reach consumers. The many important activities in the production process require companies to improve their performance to be effective and efficient in order to maintain trust. PT XYZ is a BUMD company engaged in the manufacturing of fertilizer and dolomite rock mining materials since 2018. In production activities, there are various activities that do not have added value or waste. This study aims to identify waste and find out the root causes of waste in production process activities. The implementation of Lean manufacturing is carried out by identifying the production flow process with Value Stream Mapping (VSM), then identifying 7 wastes that occur in the production process using the Waste Assessment Model (WAM) method. The results of the study showed that the waste with the highest percentage level was waste Overprocessing (P) waste transportation (T) waste overproduction (D). From the proposed improvements and mapping of future flows, it was found that lead time was reduced to 264 minutes from 350 minutes, which means eliminating 86 minutes of activities that did not provide added value. Thus, activity increased by 22% from the initial condition.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSZS, Joumil AidilNIDN0718036203joumilaidil.ti@upnjatim.ac.id
Thesis advisorWinursito, Yekti CondroNIDN0013089206yekti.condro.ti@upnjatim.ac.id.
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
T Technology > TS Manufactures
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: MUHAMMAD NIQEY DZI QOLBIN SALIEM
Date Deposited: 07 Jul 2025 03:23
Last Modified: 07 Jul 2025 03:23
URI: https://repository.upnjatim.ac.id/id/eprint/38007

Actions (login required)

View Item View Item