Analisis Pemborosan Pada Proses Produksi Pupuk Dengan Metode Lean Six Sigma dan 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) di PT Magnesium Gosari Internasional

Meisufi, Ruro Wiranti (2025) Analisis Pemborosan Pada Proses Produksi Pupuk Dengan Metode Lean Six Sigma dan 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) di PT Magnesium Gosari Internasional. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
21032010114-cover.pdf

Download (2MB)
[img] Text (Bab 1)
21032010114-bab 1.pdf

Download (302kB)
[img] Text (Bab 2)
21032010114-bab 2.pdf
Restricted to Repository staff only until 16 June 2027.

Download (940kB)
[img] Text (Bab 3)
21032010114-bab 3.pdf
Restricted to Repository staff only until 16 June 2027.

Download (394kB)
[img] Text (Bab 4)
21032010114-bab 4.pdf
Restricted to Repository staff only until 16 June 2027.

Download (1MB)
[img] Text (Bab 5)
21032010114-bab 5.pdf

Download (285kB)
[img] Text (Daftar Pustaka)
21032010114-daftarpustaka.pdf

Download (261kB)
[img] Text (Lampiran)
21032010114-lampiran.pdf
Restricted to Repository staff only

Download (956kB)

Abstract

This study aims to analyze waste in the fertilizer production process at PT Magnesium Gosari Internasional using the Lean Six Sigma approach and the 5S method. The types of waste found include defects, motion, transportation, waiting, inventory, overprocessing, and overproduction. DMAIC (Define, Measure, Analyze, Improve, Control) methodology was used to identify root causes and formulate improvement solutions. Data was collected through direct observation, questionnaires, and internal company documentation during the period August 2024 to January 2025. The analysis results show that the most dominant waste is defects, followed by motion and transportation. The initial DPMO (Defects Per Million Opportunities) value was 32,706.67 with a sigma level of 3.43. The initial lead time of the production process was recorded at 350 minutes and was successfully reduced to 305 minutes after the implementation of improvements. The improvement recommendations focused on applying the 5S method (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) to create a more efficient and organized work environment. The application of Lean Six Sigma and 5S is expected to increase process efficiency, reduce defect rates, and increase overall company productivity.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRr. Rochmoeljati, Rr. RochmoeljatiNIDN0729106102UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Ruro Wiranti Meisufi
Date Deposited: 17 Jun 2025 08:30
Last Modified: 02 Jul 2025 03:46
URI: https://repository.upnjatim.ac.id/id/eprint/37871

Actions (login required)

View Item View Item