Analisa Skedul Pengadaan dan Pemasangan High Pressure Heater PLTU dengan Metode Earn Value Analysis di PT. PAL Indonesia

Rante Tadung, Tiara Belen (2025) Analisa Skedul Pengadaan dan Pemasangan High Pressure Heater PLTU dengan Metode Earn Value Analysis di PT. PAL Indonesia. Project Report (Praktek Kerja Lapang). Jurnal Serambi Engineering, UPN Veteran Jawa Timur. (Unpublished)

[img] Text (cover)
21032010187-cover.pdf

Download (540kB)
[img] Text (bab 1)
21032010187-bab1.pdf

Download (221kB)
[img] Text (bab 2)
21032010187-bab 2.pdf
Restricted to Repository staff only until 11 June 2028.

Download (426kB)
[img] Text (bab 3)
21032010187-bab 3.pdf
Restricted to Repository staff only until 11 June 2028.

Download (508kB)
[img] Text (bab 4)
21032010187-bab 4.pdf

Download (217kB)
[img] Text (bab 5)
21032010187-bab 5.pdf

Download (172kB)
[img] Text (daftar pustaka)
21032010187-daftar pustaka.pdf

Download (171kB)
[img] Text (lampiran)
21032010187-lampiran.pdf
Restricted to Repository staff only until 11 June 2028.

Download (1MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorIriani, IrianiNIDN0726116202iriani.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Tiara Tiara Belen
Date Deposited: 12 Jun 2025 04:22
Last Modified: 12 Jun 2025 04:22
URI: https://repository.upnjatim.ac.id/id/eprint/37378

Actions (login required)

View Item View Item