Analisis Pengaruh Pre-Custom Clearance, Custom Clearance, dan Post-Custom Clearance Terhadap Dwelling Time Menggunakan Metode Regresi Linear Berganda di PT PAL Indonesia

Hardhika, Palmarosa Ardianti Putri (2025) Analisis Pengaruh Pre-Custom Clearance, Custom Clearance, dan Post-Custom Clearance Terhadap Dwelling Time Menggunakan Metode Regresi Linear Berganda di PT PAL Indonesia. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img] Text (Cover)
21032010225.-cover.pdf

Download (510kB)
[img] Text (Bab 1)
21032010225.-bab1.pdf

Download (182kB)
[img] Text (Bab 2)
21032010225.-bab2.pdf

Download (449kB)
[img] Text (Bab 3)
21032010225.-bab3.pdf
Restricted to Repository staff only until 5 May 2028.

Download (1MB)
[img] Text (Bab 4)
21032010225.-bab4.pdf
Restricted to Repository staff only until 5 May 2028.

Download (177kB)
[img] Text (Bab 5)
21032010225.-bab5.pdf
Restricted to Repository staff only until 5 May 2028.

Download (172kB)
[img] Text (Daftar pustaka)
21032010225.-daftarpustaka.pdf

Download (220kB)
[img] Text (Lampiran)
21032010225.-lampiran.pdf
Restricted to Repository staff only

Download (718kB)

Abstract

Dwelling time is the time taken to unload containers loaded with imported goods from a port until the containers leave the port. PT XYZ as a state-owned industrial company that actively carries out import activities must deal with complex challenges in managing the clearance process. Depending on the process, the dwelling time is divided into three stages, namely pre-clearance, custom clearance, and post-clearance. This study aims to determine the effect of pre-clearance, custom clearance, and post-clearance on dwelling time both simultaneously and partially and to find out which factors influence on dwelling time. The method used in this research is multiple linear regression analysis using SPSS software. The results showed that pre-clearance, custom clearance, and post-clearance factors have a significant influence on dwelling time both simultaneously and partially. The dominant factor influencing dwelling time is the post-clearance factor, with the highest coefficient value of 1.742. By making improvements at the post-clearance stage, PT XYZ can reduce the duration of dwelling time and increase its business efficiency.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSaifuddin, Joumil AidilNIDN0718036203UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Palmarosa Ardianti Putri Hardhika
Date Deposited: 06 May 2025 02:25
Last Modified: 06 May 2025 02:25
URI: https://repository.upnjatim.ac.id/id/eprint/36116

Actions (login required)

View Item View Item