Hakiki, Muhammad Hudan (2025) ANALISIS PEMBOROSAN WAKTU PADA ALIRAN DISTRIBUSI PRODUK OLEH-OLEH HAJI DAN UMROH DENGAN METODE LEAN DISTRIBUTION DI PT. USAHA UTAMA BERSAUDARA. Undergraduate thesis, UPN Veteran Jawa Timur.
![]() |
Text (Cover)
21032010050.-Cover.pdf Download (1MB) |
![]() |
Text (Bab 1)
21032010050.-Bab 1.pdf Download (234kB) |
![]() |
Text (Bab 2)
21032010050.-Bab 2.pdf Restricted to Repository staff only until 13 March 2028. Download (199kB) |
![]() |
Text (Bab 3)
21032010050.-Bab 3.pdf Restricted to Repository staff only until 13 March 2028. Download (96kB) |
![]() |
Text (Bab 4)
21032010050.-Bab 4.pdf Restricted to Repository staff only until 13 March 2028. Download (320kB) |
![]() |
Text (Bab 5)
21032010050.-Bab 5.pdf Download (9kB) |
![]() |
Text (Daftar Pustaka)
21032010050.-Daftar Pustaka.pdf Download (142kB) |
![]() |
Text (Lampiran)
21032010050.-Lampiran.pdf Restricted to Repository staff only until 13 March 2028. Download (77kB) |
Abstract
Competition in the industrial world in Indonesia is getting tighter with the development of science, especially in shipping. PT. Usaha Utama Bersaudara is a distributor company for Hajj and Umrah souvenirs since 1950 which has an outlet named Lawang Agung. The company always tries to provide the best service in fulfilling stock supplies for customers. The problems that occur in the company today are frequent delays in shipping when experiencing an increase in orders and the length of the lead time for the shipping process. This study aims to determine the level of time wasted in the shipping process and proposed improvements to reduce waste at PT. Usaha Utama Bersaudara. This study was conducted using a lean distribution approach using the value stream mapping method, process activity mapping tools, fishbone diagrams and 5W + 1H for proposed improvements. The results of the study showed that it could reduce waste time by reducing lead time from 1925 minutes to 306 minutes. Waste reduction was carried out by eliminating 13 NVA activities. Based on the proposed improvements made, it showed that the Process Cycle Efficiency (PCE) increased by 52,78% which was initially from 9,97% to 62,75%. Keywords: Distribution, Lead Time, Lean Distribution, Wast
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | M. Hudan Hakiki Hudan | ||||||||
Date Deposited: | 14 Mar 2025 01:42 | ||||||||
Last Modified: | 14 Mar 2025 01:42 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/35641 |
Actions (login required)
![]() |
View Item |