Valentino, Eki (2025) Analisis Perencanaan Penjadwalan Proyek Kapal Frigate W000304 Menggunakan Metode PERT di PT PAL INDONESIA. Project Report (Praktek Kerja Lapang). -. (Unpublished)
![]() |
Text (Cover)
21032010157_Cover.pdf Download (472kB) |
![]() |
Text (Bab 1)
21032010157_Bab 1.pdf Download (78kB) |
![]() |
Text (Bab 2)
21032010157_Bab 2.pdf Download (323kB) |
![]() |
Text (Bab 3)
21032010157_Bab 3.pdf Restricted to Repository staff only until 13 March 2028. Download (712kB) |
![]() |
Text (Bab 4)
21032010157_Bab 4.pdf Restricted to Repository staff only until 13 March 2028. Download (9kB) |
![]() |
Text (Bab 5)
21032010157_Bab 5.pdf Restricted to Repository staff only until 13 March 2028. Download (7kB) |
![]() |
Text (Daftar Pustaka)
21032010157_Daftar Pustaka.pdf Download (26kB) |
Abstract
PT. XYZ Indonesia is a state-owned company operating in the ship industry located in Surabaya, Indonesia. PT. XYZ produces merchant ships, warships, and general engineering projects. At PT. XYZ, there is a PMO (Production Management Office) division which has a job description to organize and analyze the schedule required to complete a shipbuilding project. This research uses the PERT (Program Evaluation and Review Technique) method which is used to determine 3 durations, namely optimistic duration, pessimistic duration, and the most likely duration to occur in the machine auxiliary sub-work process on the Frigate W3004 ship. Of course PT. XYZ also prioritizes quality and timeliness in completing his projects, so that the name of PT. Friends, you can compete on a national and international scale in the shipping industry. Therefore, this research aims to determine the most effective schedule both in terms of cost and time. The data needed in this research is the master schedule data for the W3004 Frigate ship project. In the research that has been carried out, it was found that the processing time of the auxiliary machine is 271 Day. Thus, the conclusion obtained from this research is that schedule analysis using the PERT method has more effective results compared to predetermined planning.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Eki Valentino | ||||||||
Date Deposited: | 13 Mar 2025 04:41 | ||||||||
Last Modified: | 13 Mar 2025 04:41 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/35545 |
Actions (login required)
![]() |
View Item |