Identifikasi Waste Pada Proses Produksi Outsole Menggunakan Metode Waste Assesment Model (WAM) Dan 5W 1H di UD. Santoso

Hernanda, Santoso Bayu (2025) Identifikasi Waste Pada Proses Produksi Outsole Menggunakan Metode Waste Assesment Model (WAM) Dan 5W 1H di UD. Santoso. Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img] Text (Cover)
21032010001-COVER .pdf

Download (2MB)
[img] Text (BAB 1)
21032010001-BAB 1.pdf

Download (334kB)
[img] Text (BAB 2)
21032010001- BAB 2.pdf
Restricted to Repository staff only until 12 March 2027.

Download (771kB)
[img] Text (BAB 3)
21032010001-Bab 3.pdf
Restricted to Repository staff only until 12 March 2027.

Download (355kB)
[img] Text (BAB 4)
21032010001-BAB 4.pdf
Restricted to Repository staff only until 12 March 2027.

Download (1MB)
[img] Text (BAB 5)
21032010001- BAB 5 .pdf

Download (237kB)
[img] Text (Daftar Pustaka)
21032010001-DAFPUS.pdf

Download (243kB)
[img] Text (Lampiran)
21032010001- LAMPIRAN'.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

UD. Santoso is a small and medium industry (IKM) engaged in the production of footwear, especially outsoles. In its production process, UD. Santoso faces various problems that result in Waste such as: a high percentage of defects, production does not match market forecasts, machine setups that take a long time, the distance between rooms is far, and inefficient material movement. The company also realizes that the outsole production process is not yet efficient and there is a lot of Waste. This study aims to identify the types of Waste that occur using the Waste assessment model method, and to provide recommendations for improvements to increase production efficiency with the 5W1H analysis. From the results of the analysis, three types of the highest Waste were found to be the main causes, namely: motion (19.34%), which is caused by the distance between the production and storage warehouses being quite far. Second, over-production (16.90%), caused by focusing too much on machine capacity and inaccurate forecasting. Third, defects (16.79%), caused by incorrect pulling techniques. As a solution, the company is advised to create a more effective layout, set production targets, and provide pulling technique training.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSumiati, Sumiati0713126001sumiati.ti@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Santoso Bayu Hernanda
Date Deposited: 13 Mar 2025 02:42
Last Modified: 13 Mar 2025 02:42
URI: https://repository.upnjatim.ac.id/id/eprint/35471

Actions (login required)

View Item View Item