Syafitri, Annisa Maudi (2025) ANALISIS RISIKO OPERASIONAL PELAYANAN PENAMBAHAN KWH MENGGUNAKAN METODE RCA (ROOT CAUSE ANALYSIS) PADA PT PLN UP3 SURABAYA BARAT. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
![]() |
Text (cover)
21032010191-cover.pdf Download (347kB) |
![]() |
Text (bab 1)
21032010191_BAB I.pdf Download (194kB) |
![]() |
Text (bab 2)
21032010191_BAB II.pdf Download (356kB) |
![]() |
Text (bab 3)
21032010191_BAB III.pdf Restricted to Repository staff only until 20 June 2028. Download (457kB) |
![]() |
Text (bab 4)
21032010191_BAB IV.pdf Restricted to Repository staff only until 20 June 2028. Download (114kB) |
![]() |
Text (lampiran)
21032010191_LAMPIRAN.pdf Restricted to Repository staff only until 20 June 2028. Download (263kB) |
![]() |
Text (daftar pustaka)
21032010191_Dafarpustaka.pdf Download (171kB) |
Abstract
Demand for additional electric power increases as electricity demand increases, but the process is often hampered by obstacles in the operational workflow. The main objective of this research is to analyze operational risks in kWh addition services using the Root Cause Analysis (RCA) method using the 5 Why technique and fishbone diagram. The RCA method equipped with a fishbone diagram will produce a mapping of the causes of operational risk obstacles in the PT PLN UP3 Surabaya Barat kWh addition service in a structured manner. In the process, the author identifies and analyzes the various risks faced, and proposes improvements aimed at improving service quality. Based on the results of the research analysis, there are two operational risks related to kWh addition, namely: the migration process of postpaid kWh meters to prepaid meters and the use of electricity by customers who exceed the contracted power. The conclusion shows that most of the operational risks come from customer behavior. Proposed improvements include increasing the frequency of inspections, proactive planning for power additions, and transparency of information to customers. The results of this report are expected to make a positive contribution to operational risk management at PT PLN UP3 Surabaya Barat and improve customer satisfaction.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | mrs annisa maudi syafitri | ||||||||
Date Deposited: | 20 Jun 2025 07:04 | ||||||||
Last Modified: | 20 Jun 2025 07:04 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/34865 |
Actions (login required)
![]() |
View Item |