Sari, Bella Wati Novita (2021) Sistem Produksi dan Analisis Pengendalian Material Plat Kapal Bantu Rumah Sakit Menggunakan Metode Economy Order Quantity di PT. PAL Indonesia (Persero). Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
Text (COVER)
18032010026-COVER.pdf Download (1MB) |
|
Text (BAB I)
18032010026-BAB 1.pdf Download (95kB) |
|
Text (BAB II)
18032010026-BAB 2.pdf Restricted to Repository staff only until 12 November 2027. Download (692kB) |
|
Text (BAB III)
18032010026-BAB 3.pdf Restricted to Repository staff only until 12 November 2027. Download (1MB) |
|
Text (BAB IV)
18032010026-BAB 4.pdf Restricted to Repository staff only until 11 November 2027. Download (167kB) |
|
Text (BAB V)
18032010026-BAB 5.pdf Restricted to Repository staff only until 12 November 2027. Download (17kB) |
|
Text (BAB VI)
18032010026-BAB 6.pdf Download (9kB) |
|
Text (DAFTAR PUSTAKA)
18032010026-DAFTAR PUSTAKA.pdf Download (119kB) |
|
Text (LAMPIRAN)
18032010026-LAMPIRAN.pdf Restricted to Repository staff only until 12 November 2027. Download (1MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | H Social Sciences > HD Industries. Land use. Labor | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Bella Wati Novita Sari | ||||||||
Date Deposited: | 12 Nov 2024 08:42 | ||||||||
Last Modified: | 12 Nov 2024 08:42 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/32010 |
Actions (login required)
View Item |