Analisis Produktivitas pada Unit Produksi dengan Metode Objective Matrix (OMAX) di CV. Serba Jaya Oke Surabaya

Destalia, Riris (2024) Analisis Produktivitas pada Unit Produksi dengan Metode Objective Matrix (OMAX) di CV. Serba Jaya Oke Surabaya. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
20032010081-Cover.pdf

Download (1MB)
[img] Text (Bab 1)
20032010081-Bab 1.pdf

Download (112kB)
[img] Text (Bab 2)
20032010081-Bab 2.pdf
Restricted to Repository staff only until 15 July 2026.

Download (471kB)
[img] Text (Bab 3)
20032010081-Bab 3.pdf
Restricted to Repository staff only until 15 July 2026.

Download (186kB)
[img] Text (Bab 4)
20032010081-Bab 4.pdf
Restricted to Repository staff only until 15 July 2026.

Download (1MB)
[img] Text (Bab 5)
20032010081-Bab 5.pdf

Download (14kB)
[img] Text (Daftar Pustaka)
20032010081-Daftar Pustaka.pdf

Download (159kB)
[img] Text (Lampiran)
20032010081-Lampiran.pdf
Restricted to Repository staff only until 16 July 2026.

Download (688kB)

Abstract

CV. Serba Jaya Oke is a manufacturing company engaged in the production of plastic household appliances. In its operations, the company experienced difficulties in achieving production targets, resulting in deviations of 11.13%. This research was conducted to analyze the productivity of production units from January to December 2023 to understand partial productivity levels and provide suggestions for improvements to the company. This research uses the objective matrix method (OMAX), analytical hierarchy process (AHP), traffic light system, fishbone diagram, and 5W+1H approach. The criteria used are the criteria for plastic pellet raw materials, labor, injection molding machine working hours, electrical energy usage, and water usage. From this research, it can be seen that the productivity index value reached its highest value in August 2023, namely 311,2%, while the lowest value occurred in December 2023 with a productivity index of -82,9%. Suggestions for improvement are given to the productivity measurement criteria 1, 2, and 3 because there are still many periods with poor scores for these criteria. By implementing this method, companies can partially increase productivity and find out the causes of decreased productivity in certain periods.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorAryanny, EnnyNIDN0728097001enny.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Riris Destalia
Date Deposited: 15 Jul 2024 07:58
Last Modified: 15 Jul 2024 07:58
URI: https://repository.upnjatim.ac.id/id/eprint/25999

Actions (login required)

View Item View Item