Putri, Adhella Ika (2024) Analisa Pemborosan pada Proses Pengiriman Barang Menggunakan Metode Lean Distribution di PT Bintang 29 Mandiri. Undergraduate thesis, UPN Veteran Jawa Timur.
Text (Cover)
20032010001-cover.pdf Download (602kB) |
|
Text (Bab 1)
20032010001-bab1.pdf.pdf Download (107kB) |
|
Text (Bab 2)
20032010001-bab2.pdf.pdf Restricted to Repository staff only until 10 July 2026. Download (371kB) |
|
Text (Bab 3)
20032010001-bab3.pdf.pdf Restricted to Repository staff only until 10 July 2026. Download (138kB) |
|
Text (Bab 4)
20032010001-bab4.pdf.pdf Restricted to Repository staff only until 10 July 2026. Download (498kB) |
|
Text (Bab 5)
20032010001-bab5.pdf.pdf Download (28kB) |
|
Text (Daftar Pustaka)
20032010001-daftarpustaka.pdf.pdf Download (165kB) |
|
Text (Lampiran)
20032010001-lampiran.pdf.pdf Restricted to Repository staff only until 10 July 2026. Download (802kB) |
Abstract
In the current era of globalization, the existence of goods delivery service companies supports almost every area of human life. PT Bintang 29 Mandiri is a company operating in the service industry, namely as a goods delivery service. In the process of delivering goods, PT Bintang 29 Mandiri always strives to provide fast and precise service. However, the problem faced by the company is the long lead time for delivery of goods. This research aims to analyze the level of waste that occurs and develop recommendations for improvements to the goods delivery process at PT Bintang 29 Mandiri. This research uses a lean distribution approach, by applying Value Stream Mapping and identifying waste using 8 wastes, namely defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and excess processing. From the research results, it was found that waiting recapitulation was 20%, excess processing was 18%, overproduction was 17%, defects were 13%, non-utilized talent was 10%, inventory was 9%, transportation was 7%, and motion was 6%. With the proposed improvements, the goods delivery process time can be reduced from 8243 minutes to 5929 minutes. Keyword: Lead time, Lean distribution, Value Stream Mapping, Waste
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Adhella Ika Putri | ||||||||
Date Deposited: | 12 Jul 2024 07:16 | ||||||||
Last Modified: | 12 Jul 2024 07:16 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/25746 |
Actions (login required)
View Item |