Evaluasi Pelaksanaan Proyek Kapal Landing Docl 125M Di PT PAL Indonesia Menggunakan Software Microsoft Project Dan S-Curve

Kawuri, Pangestika Oirala (2024) Evaluasi Pelaksanaan Proyek Kapal Landing Docl 125M Di PT PAL Indonesia Menggunakan Software Microsoft Project Dan S-Curve. Project Report (Praktek Kerja Lapang). Asosiasi Riset Ilmu Teknik Indonesia. (Unpublished)

[img] Text (COVER)
COVER.pdf

Download (374kB)
[img] Text (BAB I)
BAB I.pdf

Download (77kB)
[img] Text (BAB II)
BAB II.pdf
Restricted to Repository staff only until 25 June 2027.

Download (313kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only until 25 June 2027.

Download (513kB)
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Repository staff only until 25 June 2027.

Download (10kB)
[img] Text (BAB V)
BAB V.pdf

Download (7kB)

Abstract

Working on a project requires careful planning, so that it can be carried out with optimal time and cost. However, in practice, the implementation of project work usually encounters obstacles that cause schedule delays which result in cost overruns. Therefore, to determine the accuracy of the implementation of a project, routine evaluation and analysis is carried out with the aim of knowing how the progress of a project is progressing. In this research, the Earned Value Analysis method is used to examine trends in schedule variance and cost variance in a period (time) during the project. Based on the calculations and analysis carried out, it can be concluded that there were no delays in the implementation of the Kapal X construction project at X company, the work was carried out according to the predetermined schedule, even faster than the previously planned schedule. Based on the results of the analysis of project completion projections in terms of time, the results for the projected remaining work time (ETS) were 268 days and for the projected total project completion time to completion (EAS) it was 594 days or 306 days faster than the initial plan of 900 days

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSafirin, Moch TutukNIDN0706046301UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Pangestika Oirala Kawuri
Date Deposited: 26 Jun 2024 06:56
Last Modified: 26 Jun 2024 06:56
URI: https://repository.upnjatim.ac.id/id/eprint/24810

Actions (login required)

View Item View Item