Arifin, Dwi Qomariah (2022) Optimasi Penentuan Interval Perawatan Mesin dengan Metode Markov Chain untuk Meminimumkan Biaya Perawatan di PT. Boma Bisma Indra- Pasuruan. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
18032010151_cover.pdf Download (5MB) | Preview |
|
|
Text (BAB I)
18032010151_bab I.pdf Download (1MB) | Preview |
|
Text (BAB II)
18032010151_bab II.pdf Restricted to Registered users only until 26 July 2024. Download (8MB) |
||
Text (BAB III)
18032010151_bab III.pdf Restricted to Registered users only until April 2024. Download (1MB) |
||
Text (BAB IV)
18032010151_bab IV.pdf Restricted to Registered users only until April 2024. Download (10MB) |
||
|
Text (BAB V)
18032010151_bab V.pdf Download (281kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
18032010151_daftarpustaka.pdf Download (1MB) | Preview |
|
Text (LAMPIRAN)
18032010151_lampiran.pdf Restricted to Registered users only until 26 July 2024. Download (15MB) |
Abstract
PT BBI is a company engaged in producing machinery, industrial equipment, and foundry. PT BBI has overgrown as a company that focuses on manufacturing and delivering products such as oil and gas/refinery/petrochemical industries, power plans, iron castings, precision machinery centers, etc. PT BBI uses various kinds of machines to support its production process. Some devices have often experienced damage and caused downtime in recent years, namely radial drilling machines and overhead cranes. In addition, machine damage also causes cost overruns due to damage that can harm the company. Engine damage caused is due to the company's poor maintenance policy. Judging from these problems, planning a maintenance system with a suitable method will help the machines and production equipment owned by PT. BBI is protected from damage that occurs periodically. The Markov Chain method was chosen because it has advantages over other maintenance methods because it produces more optimal maintenance costs with a regular maintenance scheduling system. The processing results obtained a total savings of 41% by applying the Markov Chain proposed maintenance method with maintenance intervals every 5 months for radial drilling machines and once every 3 months for 10T overhead cranes.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Dwi Qomariah Arifin | ||||||||
Date Deposited: | 04 Mar 2024 05:28 | ||||||||
Last Modified: | 04 Mar 2024 05:28 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/8038 |
Actions (login required)
View Item |