SISTEM PRODUKSI DAN ANALISIS PERENCANAAN PERSEDIAAN BAHAN BAKU BATUBARA DENGAN MENGGUNAKAN METODE MRP ( MATERIAL REQUIREMENTS PLANNING ) DI DEPARTEMEN IIIB UTILITAS BATUBARA PT PETROKIMIA GRESIK

Puspitasari, Dewi Cahyani (2022) SISTEM PRODUKSI DAN ANALISIS PERENCANAAN PERSEDIAAN BAHAN BAKU BATUBARA DENGAN MENGGUNAKAN METODE MRP ( MATERIAL REQUIREMENTS PLANNING ) DI DEPARTEMEN IIIB UTILITAS BATUBARA PT PETROKIMIA GRESIK. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
18032010141.-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
18032010141.-bab1.pdf

Download (413kB) | Preview
[img]
Preview
Text (Bab 2)
18032010141.-bab2.pdf

Download (962kB) | Preview
[img]
Preview
Text (Bab 3)
18032010141.-bab3.pdf

Download (1MB) | Preview
[img] Text (Bab 4)
18032010141.-bab4.pdf
Restricted to Registered users only until 21 July 2024.

Download (2MB)
[img] Text (Bab 5)
18032010141.-bab5.pdf
Restricted to Registered users only until 21 July 2024.

Download (491kB)
[img]
Preview
Text (Bab 6)
18032010141.-bab6.pdf

Download (377kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
18032010141.-daftarpustaka.pdf

Download (427kB) | Preview
[img] Text (Lampiran)
18032010141.-lampiran.pdf
Restricted to Registered users only until 21 July 2024.

Download (2MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorDonoriyanto, Dwi SukmaNIDN0026078101UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: DEWI CAHYANI PUSPITASARI
Date Deposited: 22 Jul 2022 02:38
Last Modified: 22 Jul 2022 02:38
URI: http://repository.upnjatim.ac.id/id/eprint/7943

Actions (login required)

View Item View Item