Ramadhan, Atho'illah Fajar (2022) ANALISIS PERENCANAAN BAHAN BAKU PAVING BLOCK DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) DI PT. PESONA ARNOS BETON. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
17012010006-cover.pdf Download (560kB) | Preview |
|
|
Text (Bab 1)
17012010006-bab1.pdf Download (811kB) | Preview |
|
|
Text (Bab 2)
17012010006-bab2.pdf Download (660kB) | Preview |
|
Text (Bab 3)
17012010006-bab3.pdf Restricted to Registered users only until 10 June 2024. Download (227kB) |
||
Text (Bab 4)
17012010006-bab4.pdf Restricted to Registered users only until 10 June 2024. Download (656kB) |
||
|
Text (Bab 5)
17012010006-bab5.pdf Download (208kB) | Preview |
|
|
Text (Daftar Pustaka)
17012010006-daftarpustaka.pdf Download (435kB) | Preview |
|
Text (Lampiran)
17012010006-lampiran.pdf Restricted to Registered users only until 10 June 2024. Download (310kB) |
Abstract
Optimal control of raw materials can minimize inventory costs and the company can determine the right order quantity. This study aims to determine the planning of paving block raw material needs in 2022 in order to minimize costs. The methods used are forecasting, Material Requirement Planning, and Aggregate Planning. The results of the forecasting method show that Exponential Smoothing has the smallest standard error. Meanwhile, the MRP results show that the total cost of the LFL method is Rp. 18,565,627 less than the POQ method of Rp. 24,530,943. This shows that the cost of the LFL method is lower than the POQ method. The results of Aggregate Planning show a total cost of Rp. 506,752,500. This method allows the company to do Over Time to meet consumer demand even though the company incurs an Over Time fee of Rp. 6,000,000. If the company does not do Over Time, the company will experience a loss because it cannot meet the demand of 549 m² x Rp. 55,000,000 = Rp. 30,195,000.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management |
||||||||
Divisions: | Faculty of Economic > Departement of Management | ||||||||
Depositing User: | Atho'illah Fajar Ramadhan | ||||||||
Date Deposited: | 13 Jun 2022 02:35 | ||||||||
Last Modified: | 13 Jun 2022 02:35 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/7032 |
Actions (login required)
View Item |