Implementasi Value Stream Mapping Dan Value Stream Analysis Untuk Meminimalisir Pemborosan Waktu Pada Proses Distribusi di PT. Nur Jaya Energi

Novitasari, Berliana Dian (2022) Implementasi Value Stream Mapping Dan Value Stream Analysis Untuk Meminimalisir Pemborosan Waktu Pada Proses Distribusi di PT. Nur Jaya Energi. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
18032010005-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
1803201005-bab1.pdf

Download (417kB) | Preview
[img]
Preview
Text (Bab 2)
1803201005-bab2.pdf

Download (1MB) | Preview
[img] Text (Bab 3)
1803201005-bab3.pdf
Restricted to Registered users only until 2 June 2024.

Download (472kB)
[img] Text (Bab 4)
1803201005-bab4.pdf
Restricted to Registered users only until 2 June 2024.

Download (1MB)
[img]
Preview
Text (Bab 5)
1803201005-bab5.pdf

Download (191kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
1803201005-daftarpustaka.pdf

Download (416kB) | Preview
[img] Text (Lampiran)
1803201005-lampiran.pdf
Restricted to Registered users only until 2 June 2024.

Download (1MB)

Abstract

PT. Nur Jaya Energi is a non manufacturing company engaged in transportation logistics. PT. Nur Jaya Energi hopes to reduce waste in the distribution process, so that the company can earn greater profits and be able to compete in today's industry. The purpose of this research is to identify, reduce and propose improvements to waste in the distribution process of fuel oil. The method used is conceptual lean manufacturing with value stream mapping tools and the help of the Failure Mode and Effects Analysis (FMEA) method. Based on the results of research on value stream mapping, it was found that the time reduction was from 590 to 565 minutes. Based on Failure Mode and Effect Analysis (FMEA) it is known that the root cause of the problem in the highest waste is the occurrence of bottlenecks due to operator errors and machine settings that are not in accordance with the procedure. Recommendations for improvement that can be proposed are coordinating between companies when a pump malfunction occurs so that there is no prolonged bottleneck that can slow down delivery times

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRr, RochmoeljatiNIDN0729106102UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Berliana Berliana Dian Novitasari Berli
Date Deposited: 03 Jun 2022 02:00
Last Modified: 03 Jun 2022 02:00
URI: http://repository.upnjatim.ac.id/id/eprint/6644

Actions (login required)

View Item View Item