PABRIK ASAM ASETAT DENGAN PROSES KARBONILASI METHANOL MONSANTO

NOVIANA, PRASTICHA ROSA (2019) PABRIK ASAM ASETAT DENGAN PROSES KARBONILASI METHANOL MONSANTO. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
cover.pdf

Download (674kB) | Preview
[img]
Preview
Text (Bab 1)
BAB I .pdf

Download (181kB) | Preview
[img] Text (Bab 2)
BAB II.pdf
Restricted to Registered users only until 4 October 2022.

Download (192kB)
[img] Text (Bab 3)
BAB III.pdf
Restricted to Registered users only until 4 October 2022.

Download (77kB)
[img] Text (Bab 4)
BAB IV.pdf
Restricted to Registered users only until 4 October 2022.

Download (89kB)
[img] Text (Bab 5)
BAB V.pdf
Restricted to Registered users only until 4 October 2022.

Download (3kB)
[img] Text (Bab 6)
BAB VI.pdf
Restricted to Registered users only until 4 October 2022.

Download (119kB)
[img] Text (Bab 7)
BAB VII.pdf
Restricted to Registered users only until 4 October 2022.

Download (613kB)
[img] Text (Bab 8)
BAB VIII.pdf
Restricted to Registered users only until 4 October 2022.

Download (136kB)
[img] Text (Bab IX)
BAB IX.pdf
Restricted to Registered users only until 4 October 2022.

Download (186kB)
[img]
Preview
Text (Bab 10)
BAB X.pdf

Download (89kB) | Preview
[img]
Preview
Text (Daftar pustaka)
DAFTAR PUSTAKA.pdf

Download (55kB) | Preview

Abstract

Perencanaan Pabrik Asam Asetat dengan Proses Karbonilasi Methanol Monsanto ini direncanakan untuk kapasitas produksi Asam Asetat 99% sebesar 50.000 ton/tahun. Pra rencana pabrik acetic acid ini direncanakan beroperasi selama 330 hari/tahun dengan data –data sebagai berikut : 1. Kapasitas Produksi : 50.000 ton/tahun 2. Bentuk Organisasi : Perseroan Terbatas 3. Bahan yang digunakan : Methanol dan CO 4. Sistem Operasi : Kontinyu 5. Lokasi : Bontang Kalimantan Timur 6. Luas Tanah : 25.400 m 2 7. Jumlah Karyawan : 178 orang 8. Struktur Organisasi : Garis dan Staff 9. FCI : Rp 237.534.372.378 10. WCI : Rp 15.463.999.059 11. Laju Pengembalian modal : 29,9% 12. Pay back periode : 3,02 tahun 13. BEP : 40,38%

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TP Chemical technology > TP155 Chemical engineering
Depositing User: Fatchullah Fatchullah
Date Deposited: 05 Oct 2021 06:41
Last Modified: 05 Oct 2021 06:41
URI: http://repository.upnjatim.ac.id/id/eprint/2742

Actions (login required)

View Item View Item