Al Muttaqin, Nashrotul Ummah SISTEM PRODUKSI DAN PENGUKURAN BEBAN KERJA MENTAL OPERATOR DALAM PROSES PRODUKSI MINYAK ANGIN 1001 DAN AROMATIC 1001 DI PT. INTERNATIONAL CHEMICAL INDUSTRY PLANT 2 SURABAYA. Project Report (Praktek Kerja Lapang). UPN "Veteran" Jawa Timur. (Unpublished)
|
Text (Cover)
19032010082-cover.pdf Download (2MB) | Preview |
|
|
Text (Bab 1)
19032010082-bab1.pdf Download (138kB) | Preview |
|
|
Text (Bab 2)
19032010082-bab2.pdf Download (290kB) | Preview |
|
Text (Bab 3)
19032010082-bab3.pdf Restricted to Registered users only until 14 September 2025. Download (588kB) |
||
Text (Bab 4)
19032010082-bab4.pdf Restricted to Registered users only until 14 September 2025. Download (309kB) |
||
Text (Bab 5)
19032010082-bab5.pdf Restricted to Registered users only until 14 September 2025. Download (89kB) |
||
Text (Bab 6)
19032010082-bab6.pdf Restricted to Registered users only until 14 September 2025. Download (62kB) |
||
|
Text (Daftar Pustaka)
19032010082-daftarpustaka.pdf Download (60kB) | Preview |
|
Text (Lampiran)
19032010082-lampiran.pdf Restricted to Registered users only until 14 September 2025. Download (918kB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Nashrotul Ummah Al Muttaqin | ||||||||
Date Deposited: | 15 Sep 2023 03:47 | ||||||||
Last Modified: | 15 Sep 2023 03:47 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/17377 |
Actions (login required)
View Item |