SISTEM PRODUKSI DAN PENGUKURAN BEBAN KERJA MENTAL OPERATOR DALAM PROSES PRODUKSI MINYAK ANGIN 1001 DAN AROMATIC 1001 DI PT. INTERNATIONAL CHEMICAL INDUSTRY PLANT 2 SURABAYA

Al Muttaqin, Nashrotul Ummah SISTEM PRODUKSI DAN PENGUKURAN BEBAN KERJA MENTAL OPERATOR DALAM PROSES PRODUKSI MINYAK ANGIN 1001 DAN AROMATIC 1001 DI PT. INTERNATIONAL CHEMICAL INDUSTRY PLANT 2 SURABAYA. Project Report (Praktek Kerja Lapang). UPN "Veteran" Jawa Timur. (Unpublished)

[img]
Preview
Text (Cover)
19032010082-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
19032010082-bab1.pdf

Download (138kB) | Preview
[img]
Preview
Text (Bab 2)
19032010082-bab2.pdf

Download (290kB) | Preview
[img] Text (Bab 3)
19032010082-bab3.pdf
Restricted to Registered users only until 14 September 2025.

Download (588kB)
[img] Text (Bab 4)
19032010082-bab4.pdf
Restricted to Registered users only until 14 September 2025.

Download (309kB)
[img] Text (Bab 5)
19032010082-bab5.pdf
Restricted to Registered users only until 14 September 2025.

Download (89kB)
[img] Text (Bab 6)
19032010082-bab6.pdf
Restricted to Registered users only until 14 September 2025.

Download (62kB)
[img]
Preview
Text (Daftar Pustaka)
19032010082-daftarpustaka.pdf

Download (60kB) | Preview
[img] Text (Lampiran)
19032010082-lampiran.pdf
Restricted to Registered users only until 14 September 2025.

Download (918kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPudji W., EndangNIDN0728126002UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Nashrotul Ummah Al Muttaqin
Date Deposited: 15 Sep 2023 03:47
Last Modified: 15 Sep 2023 03:47
URI: http://repository.upnjatim.ac.id/id/eprint/17377

Actions (login required)

View Item View Item