Sari, Tarisa Nindyas Sistem Produksi Listrik Pada PLTU Dan Manajemen Kesehatan Dan Keselamatan Kerja (K3) PT. Pembangkit Jawa Bali (PJB) Unit Pembangkitan (UP) Gresik. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (COVER)
19032010122-COVER.pdf Download (1MB) | Preview |
|
|
Text (BAB 1)
19032010122-BAB 1.pdf Download (328kB) | Preview |
|
|
Text (BAB 2)
19032010122-BAB 2.pdf Download (798kB) | Preview |
|
Text (BAB 3)
19032010122-BAB 3.pdf Restricted to Registered users only until 23 July 2024. Download (827kB) |
||
Text (BAB 4)
19032010122-BAB 4.pdf Restricted to Registered users only until 23 July 2024. Download (841kB) |
||
Text (BAB 5)
19032010122-BAB 5.pdf Restricted to Registered users only until 23 July 2024. Download (214kB) |
||
|
Text (BAB 6)
19032010122-BAB 6.pdf Download (206kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
19032010122-DAFTAR PUSTAKA.pdf Download (417kB) | Preview |
|
Text (LAMPIRAN)
19032010122-LAMPIRAN.pdf Restricted to Registered users only until 23 July 2024. Download (434kB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | tarisa nindyas sari | ||||||||
Date Deposited: | 24 Jul 2023 07:15 | ||||||||
Last Modified: | 24 Jul 2023 07:15 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/15993 |
Actions (login required)
View Item |