Intervensi Rencana Desain dan Pengelolaan Limbah B3 (Studi Kasus : Kantor PT Pertamina Jagir, Surabaya)

Tampubolon, Fitri Alya (2023) Intervensi Rencana Desain dan Pengelolaan Limbah B3 (Studi Kasus : Kantor PT Pertamina Jagir, Surabaya). Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (COVER)
19034010101-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB 1)
19034010101-bab1.pdf

Download (84kB) | Preview
[img] Text (BAB 2)
19034010101-bab2.pdf
Restricted to Registered users only until 20 July 2025.

Download (883kB)
[img] Text (BAB 3)
19034010101-bab3.pdf
Restricted to Registered users only until 20 July 2025.

Download (404kB)
[img] Text (BAB 4)
19034010101-bab4.pdf
Restricted to Registered users only until 20 July 2025.

Download (1MB)
[img] Text (BAB 5)
19034010101-bab5.pdf
Restricted to Registered users only until 20 July 2025.

Download (6kB)
[img]
Preview
Text (DAFTAR PUSTAKA)
19034010101-daftarpustaka.pdf

Download (142kB) | Preview
[img] Text (LAMPIRAN)
19034010101-lampiran.pdf
Restricted to Registered users only until 20 July 2025.

Download (8MB)

Abstract

B3 waste is a type of waste that can have a negative impact on human health and the environment if not managed properly. Hazardous and Toxic Waste (B3) can cause environmental pollution and damage if it is disposed of directly into the environment. To avoid the impact of B3 waste, an integrated and sustainable management system is needed. The hazardous waste generated at the office has been managed, but various improvements still need to be made in accordance with applicable regulations. Management of B3 waste is part of efforts to realize sustainable development with an environmental perspective. One of the efforts that can be made to improve waste management at the office is by planning and managing temporary storage areas (TPS) for B3 waste in accordance with applicable regulations. This plan consists of 2 rooms, namely medical waste room and solid and liquid waste room. The building area of the TPS for B3 waste is 18.10 m2 with dimensions of 4.96 m x 3.65 m. The management of B3 waste includes packaging, storage and transportation systems that have been adjusted to the applicable regulations.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRosariawari, Firra0709047501firra.tl@upnjatim.ac.od
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Fitri Alya Tampubolon
Date Deposited: 21 Jul 2023 07:20
Last Modified: 21 Jul 2023 07:20
URI: http://repository.upnjatim.ac.id/id/eprint/15612

Actions (login required)

View Item View Item