Alaydrus, Umar Mahdi and Wilianto, Miftahul Ulum (2022) Metode Pekerjaan Kolom, Balok, Dan Pelat Lantai 6 Dan 7 Pada Proyek RSUD Dr. M. Soewandhie Surabaya. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (COVER)
18035010037-cover.pdf Download (618kB) | Preview |
|
|
Text (BAB 1)
18035010037-bab1.pdf Download (966kB) | Preview |
|
|
Text (BAB 2)
18035010037-bab2.pdf Download (284kB) | Preview |
|
Text (BAB 3)
18035010037-bab3.pdf Restricted to Registered users only until 27 January 2025. Download (344kB) |
||
Text (BAB 4)
18035010037-bab4.pdf Restricted to Registered users only until 27 January 2025. Download (4MB) |
||
Text (BAB 5)
18035010037-bab5.pdf Restricted to Registered users only until 27 January 2025. Download (1MB) |
||
|
Text (BAB 6)
18035010037-bab6.pdf Download (139kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
18035010037-daftarpustaka.pdf Download (118kB) | Preview |
|
Text (LAMPIRAN)
18035010037-lampiran.pdf Restricted to Registered users only until 27 January 2025. Download (7MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
Depositing User: | Umar Mahdi Alaydrus | ||||||||
Date Deposited: | 27 Jan 2023 03:31 | ||||||||
Last Modified: | 27 Jan 2023 03:31 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/11826 |
Actions (login required)
View Item |