ANALISA SISTEM PRODUKSI DAN PERENCANAAN PENGENDALIAN MATERIAL PAVING BLOCK K-300 DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) DI PT. DUTA BETON MANDIRI

Darmawan, Mochammad Adam (2023) ANALISA SISTEM PRODUKSI DAN PERENCANAAN PENGENDALIAN MATERIAL PAVING BLOCK K-300 DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) DI PT. DUTA BETON MANDIRI. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
18032010017.-cover.pdf

Download (1MB) | Preview
[img]
Preview
Text (Bab 1)
18032010017.-bab1.pdf

Download (296kB) | Preview
[img]
Preview
Text (Bab 2)
18032010017.-bab2.pdf

Download (576kB) | Preview
[img] Text (Bab 3)
18032010017.-bab3.pdf
Restricted to Registered users only until 24 January 2025.

Download (1MB)
[img] Text (Bab 4)
18032010017.-bab4.pdf
Restricted to Registered users only until 24 January 2025.

Download (704kB)
[img] Text (Bab 5)
18032010017.-bab5.pdf
Restricted to Registered users only until 24 January 2025.

Download (310kB)
[img]
Preview
Text (Bab 6)
18032010017.-bab6.pdf

Download (178kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
18032010017.-daftarpustaka.pdf

Download (169kB) | Preview
[img] Text (Lampiran)
18032010017.-lampiran.pdf
Restricted to Registered users only until 24 January 2025.

Download (1MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPulansari, FaridaNIDN0703027901UNSPECIFIED
Subjects: T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Mochammad Adam Darmawan
Date Deposited: 24 Jan 2023 06:03
Last Modified: 24 Jan 2023 06:03
URI: http://repository.upnjatim.ac.id/id/eprint/11563

Actions (login required)

View Item View Item