Proses Pengolahan Bijih Nikel Menjadi Nikel Matte di PT. Vale Indonesia Tbk.

Ramadhani, Ayu Nadya (2022) Proses Pengolahan Bijih Nikel Menjadi Nikel Matte di PT. Vale Indonesia Tbk. Project Report (Praktek Kerja Lapang). Universitas Pembangunan Nasional "Veteran" Jawa Timur, Surabaya. (Unpublished)

[img]
Preview
Text (Cover)
18031010055_COVER.pdf

Download (442kB) | Preview
[img]
Preview
Text (BAB I)
18031010055_BAB I.pdf

Download (217kB) | Preview
[img]
Preview
Text (BAB II)
18031010055_BAB II.pdf

Download (230kB) | Preview
[img] Text (BAB III)
18031010055_BAB III.pdf
Restricted to Registered users only until 24 January 2026.

Download (1MB)
[img] Text (BAB IV)
18031010055_BAB IV.pdf
Restricted to Registered users only until 24 January 2026.

Download (267kB)
[img] Text (BAB V)
18031010055_BAB V.pdf
Restricted to Registered users only until 24 January 2026.

Download (1MB)
[img] Text (BAB VI - BAB VIII)
18031010055_BAB VI - BAB VIII.pdf
Restricted to Registered users only until 24 January 2026.

Download (1MB)
[img]
Preview
Text (BAB IX)
18031010055_BAB IX.pdf

Download (75kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
18031010055_DAFTAR PUSTAKA.pdf

Download (98kB) | Preview
[img] Text (LAMPIRAN)
18031010055_LAMPIRAN.pdf
Restricted to Registered users only until 24 January 2026.

Download (1MB)

Abstract

Implementation This field work practice aims to gain experience related to practical studies, in order to fulfill one of the Chemical Engineering undergraduate program subjects, Faculty of Engineering, East Java Veterans National Development University. This field work practice provides students with knowledge in the field of factory design, namely the raw materials used, the products produced, the specifications of the tools used, the process of producing raw materials into a product, utility processes, waste treatment processes, transportation used, company economic analysis , etc. In addition to building cooperation between the East Java Veterans National Development University and the company. This Field Work Practice was carried out in Sorowako, East Luwu Regency, South Sulawesi. Implementation for 3 months starting from 22 August 2021 to 15 October 2021, in the plant process sector.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSani, SaniNIDN 0712046303UNSPECIFIED
Subjects: T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Ayu Nadya Ramadhani
Date Deposited: 25 Jan 2023 08:07
Last Modified: 25 Jan 2023 08:07
URI: http://repository.upnjatim.ac.id/id/eprint/11490

Actions (login required)

View Item View Item