Wahyudi, Hartato (2022) Perencanaan Sistem Produksi Di Bagian Pengendalian Bahan Baku Facial Tissue Di PT. Pemenang Jaya Tissue. Project Report (Praktek Kerja Lapang). UPN VETERAN JAWA TIMUR.
|
Text
18032010154 - Cover.pdf Download (1MB) | Preview |
|
|
Text
18032010154 - Bab 1.pdf Download (351kB) | Preview |
|
Text
18032010154 - Bab 2.pdf Restricted to Registered users only until 2024. Download (690kB) | Request a copy |
||
Text
18032010154 - Bab 3.pdf Restricted to Registered users only until 2024. Download (630kB) | Request a copy |
||
Text
18032010154 - Bab 4.pdf Restricted to Registered users only until 2024. Download (623kB) | Request a copy |
||
|
Text
18032010154 - Bab 5.pdf Download (224kB) | Preview |
|
|
Text
18032010154 - daftarpustaka.pdf Download (340kB) | Preview |
|
Text
18032010154 - Lampiran.pdf Restricted to Registered users only until 2024. Download (2MB) | Request a copy |
Abstract
PT. Pemenang Jaya Tissue is a company that has a production process products require a warehouse (inventory). Production management on the company if it is considered less than optimal as an indication that there are several raw materials that accumulate so that the warehouse is full because it is necessary doing production system planning in the inventory control section 3 to control inventory so that there is no buildup or shortage raw materials for production. for that use Data collection, Determining Economic Order Quantity (EOQ), Determining safety stock, and Determining the reoder point. paper pulp raw materials, namely the number of orders economy (EOQ) for paper pulp raw material, which is 2387 Kg each time order in the following year with the frequency of reordering paper raw materials pulp that is for 9 times and the number of days of reordering for 34 days. For Safety stock (Safety Stock) of paper pulp raw materials obtained as much as 159 kg. (Reorder Point) the raw material is paper pulp, then the company must place an order for paper pulp returned when the paper pulp inventory in the warehouse was 1232 Kg.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Mr. Hartato Wahyudi | ||||||||
Date Deposited: | 15 Nov 2022 03:05 | ||||||||
Last Modified: | 15 Nov 2022 03:05 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/10219 |
Actions (login required)
View Item |