Items where Division is "Faculty of Engineering > Departement of Industrial Engineering" and Year is 2029
![]() | Up a level |
Number of items: 2.
N
Nugroho, Aldi Pramoedya (2029) ANALISIS MITIGASI RISIKO SUPPLY CHAIN MENGGUNAKAN PENDEKATAN METODE HOUSE OF RISK PADA PT KOMI BIOMASS INDONESIA. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.
S
Sari, Zulia Wulan (2029) PENGENDALIAN PERSEDIAAN BAHAN BAKU CLOTH DIAPER AIO REGULER PADA CV HASTA NINGRAT MENGGUNAKAN METODE LAGRANGE MULTIPLIER DAN REORDER POINT (ROP). Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.
