Browse by Contributors

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | Date | No Grouping
Number of items: 12.

2021

Oktavia, Ainun and Syavila, Aulia (2021) LAPORAN KERJA PRAKTIK METODE PELAKSANAAN PENGECORAN KOLOM AS 4/L ELV +2800. Project Report (Praktek Kerja Lapang dan Magang). UPN Veteran Jawa Timur.

22 November 2021

ANGGRAHENI, SILVIA ROSIANA (2021) ANALISIS BIAYA PEMELIHARAAN BANGUNAN GEDUNG SEKOLAH (Studi Kasus Gedung Sekolah di Kelurahan Medokan Ayu dan Rungkut Kidul, Kecamatan Rungkut, Kota Surabaya). Undergraduate thesis, UPN "VETERAN' JAWA TIMUR.

24 July 2022

Pasaribu, Reno Johanes and Aldiansyah, Rachmad Haris (2022) METODE PENGECORAN BALOK-KOLOM-PLAT LANTAI PADA PEMBANGUNAN GEDUNG TIPE B1 RSUD DR. M. SOEWANDHIE SURABAYA. Undergraduate thesis, UPN Veteran Jawa Timur.

25 July 2022

Putri, Pinky Febrilla Carienta (2022) ANALISA PRODUKTIVITAS DAN BIAYA PENGGUNAAN STRUKTUR KOMPOSIT DAN KONVENSIONAL PELAT LANTAI PADA PROYEK PEMBANGUNAN TAHAP II RSUD DR. M. SOEWANDHIE SURABAYA. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.

Ramadhan, Muhammad Haqiqi (2022) Analisis Kinerja dan Estimasi Terhadap Biaya dan Waktu Menggunakan Earned Value Analysis Pada Proyek Pembangunan Gedung Baru dan Renovasi Polda Jatim. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.

Tawakal, Muhammad Iqbal (2022) ANALISIS LIFE CYCLE COST PADA PEMELIHARAAN BANGUNAN GEDUNG (Studi Kasus Gedung SDN Rungkut Menanggal I/582). Undergraduate thesis, Univertitas Pembangunan Nasional Veteran Jawa Timur.

26 July 2022

Mafrudi, Imam (2022) PENGUKURAN KINERJA MANAJEMEN RANTAI PASOK PADA PEMBANGUNAN LANDED HOUSING. Undergraduate thesis, Universitas Pembangunan Nasional Veteran Jawa Timur.

24 July 2023

Pebria, Shinta Amyrul and Hisan, Fihinna Khoirotun (2023) PROYEK PEMBANGUNAN GEDUNG KULIAH DAN LABORATORIUM FAKULTAS KEDOKTERAN DAN FAKULTAS ILMU SOSIAL DAN ILMU POLITIK UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAWA TIMUR. Project Report (Praktek Kerja Lapang dan Magang). UNIVERSITAS PEMBANGUNAN NASIONAL "VETERAN" JAWA TIMUR.

25 July 2023

Akbar, Ilham and Rifqi Hanan, Riokka (2023) METODE PELAKSAAN PEKERJAAN BALOK DAN KOLOM PADA PROYEK PEMBANGUNAN SEKOLAH ISLAM AL AZHAR MALANG. Project Report (Praktek Kerja Lapang dan Magang). UNIVERSITAS PEMBANGUNAN NASIONAL "VETERAN" JAWA TIMUR.

16 November 2023

Azis, Rivi Fathurrachman and Putra, Ewaldo Anggara (2023) PROYEK PEMBANGUNAN APARTEMEN PAKUWON RESIDENCE BEKASI MIXED USE DEVELOPMENT. Project Report (Praktek Kerja Lapang dan Magang). UPN VETERAN JATIM REPOSITORY.

9 January 2024

Juita, Elfina Priskila (2024) IMPLEMENTASI METODE BUILDING INFORMATION MODELING (BIM) TERHADAP PEMBUATAN BILL OF QUANTITY (BOQ) PADA PEKERJAAN STRUKTUR GEDUNG FT 3. Undergraduate thesis, UPN Veteran Jawa Timur.

29 May 2024

Al farisi, Moh. salman (2024) ANALISIS PERCEPATAN DURASI PENYELESAIAN PROYEK KONTRUKSI JALAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA ALAT BERAT. Undergraduate thesis, Universitas Pembangunan Nasional Veteran Jawa Timur.

This list was generated on Sun Sep 28 05:52:50 2025 WIB.