ANALISA BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA TLX UNTUK MENINGKATKAN KINERJA KARYAWAN PT. BHUMYAMCA SEKAWAN – CIBIS PARK

Krisnanda, Hanif Dwiantyo (2022) ANALISA BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA TLX UNTUK MENINGKATKAN KINERJA KARYAWAN PT. BHUMYAMCA SEKAWAN – CIBIS PARK. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (COVER)
1532010085-Cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB I)
1532010085-bab 1.pdf

Download (2MB) | Preview
[img] Text (BAB II)
1532010085-bab 2.pdf
Restricted to Registered users only until 20 September 2024.

Download (7MB)
[img] Text (BAB III)
1532010085-bab 3.pdf
Restricted to Registered users only until 20 September 2024.

Download (3MB)
[img] Text (BAB IV)
1532010085-bab 4.pdf
Restricted to Registered users only until 20 September 2024.

Download (6MB)
[img]
Preview
Text (BAB V)
1532010085-bab 5.pdf

Download (801kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
1532010085-daftar pustaka.pdf

Download (1MB) | Preview
[img] Text (LAMPIRAN)
1532010085-Lampiran.pdf
Restricted to Registered users only until 20 September 2024.

Download (3MB)

Abstract

PT Bhumyamca Sekawan is a company engaged in the property rental sector such as office, workshops and warehousing by prioritizing the best and excellent service to tenants or renter. Human Resources (HR) such as employee, laborer or engineer, is one of the most fundamental aspects for a company. No matter how advanced technology today that able to replaces most of the human element, there are still many activities that cannot be replace by its. Human resource Management (HRM) is one of the general fields in management which includes aspects of planning, organizing, implementing and controlling. Some of the employee workloads of PT. Bhumyamca Sekawan of the Cibis Nine Department either overloaded or underload. Although the job description is different but, the same deadline in their job reduces employee’s concentration and quality at work. This study is discussed the workload relation both physically and mentally using the FTE and NASA-TLX calculations

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSuryadi, AkmalNIDN 0712016501Akmal.suryadi65@gmail.com
Subjects: T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: HANIF DWIANTYO KRISNANDA
Date Deposited: 21 Sep 2022 01:24
Last Modified: 21 Sep 2022 01:24
URI: http://repository.upnjatim.ac.id/id/eprint/9432

Actions (login required)

View Item View Item