Pengembangan Tempat Pemrosesan Akhir Sampah Dengan Metode Sanitary Landfill (Studi Kasus : TPA Paras Poncokusumo, Kabupaten Malang)

Sya'baniyah, Nur Fajri Nishfi (2022) Pengembangan Tempat Pemrosesan Akhir Sampah Dengan Metode Sanitary Landfill (Studi Kasus : TPA Paras Poncokusumo, Kabupaten Malang). Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img]
Preview
Text (COVER)
18034010029_COVER.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB 1)
18034010029_BAB 1.pdf

Download (123kB) | Preview
[img] Text (BAB 2)
18034010029_BAB 2.pdf
Restricted to Registered users only until 19 September 2024.

Download (933kB)
[img] Text (BAB 3)
18034010029_BAB 3.pdf
Restricted to Registered users only until 19 September 2024.

Download (174kB)
[img] Text (BAB 4)
18034010029_BAB 4.pdf
Restricted to Registered users only until 19 September 2024.

Download (1MB)
[img]
Preview
Text (BAB 5)
18034010029_BAB 5.pdf

Download (55kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
18034010029_DAFTAR PUSTAKA.pdf

Download (118kB) | Preview
[img] Text (LAMPIRAN)
18034010029_LAMPIRAN.pdf
Restricted to Registered users only until 19 September 2024.

Download (10MB)

Abstract

The Paras Poncokusumo Final Processing Site which has been operating since 1998 is still implementing a controlled landfill system and requires new land because it is no longer able to accommodate the increasing amount of waste from time to time. The purpose of this final project is to plan a landfill with a sanitary landfill system according to regulations in Indonesia. This planning includes the landfill zones, gas pipelines, leachate pipelines, which are equipped with design engineering design and budget plan. Based on the existing condition of TPA Paras, it is planned to use the landfill method using the canyon method with zone 1 excavation volume, which is 157,272.20 m3. Meanwhile, zone 2 has an excavated volume of 110,134.73 m3. According to calculations, the service life of this landfill is about 14 years starting from 2022 to 2035. The resulting leachate is channeled to the planned WWTP, which consists of a reservoir with dimensions of 1.4 m x 1.4 m x 2.3 m, an anaerobic tank with dimensions of 20 m x 10 m x 2.8 m, and facultative pond with dimensions of 22 m x 11 m x 2.3 m. The cost required for the construction of the Paras Poncokusumo Final Processing Site is Rp. 25,905,213,858.95. Keywords: Planning, Waste, Sanitary landfill

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRosariawari, Firra0709047501firra.tl@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Nur Fajri Nishfi Sya'baniyah
Date Deposited: 20 Sep 2022 04:24
Last Modified: 20 Sep 2022 04:24
URI: http://repository.upnjatim.ac.id/id/eprint/9234

Actions (login required)

View Item View Item