Perencanaan Tempat Pengolahan Sampah 3R (Redyce Reuse Recycle) di Kecamatan Kesamben Kabupaten Jombang

Pratiwi, Nanda Henik (2022) Perencanaan Tempat Pengolahan Sampah 3R (Redyce Reuse Recycle) di Kecamatan Kesamben Kabupaten Jombang. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
18034010023_Cover.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB I)
18034010023_Bab1.pdf

Download (522kB) | Preview
[img] Text (BAB II)
18034010023_Bab2.pdf
Restricted to Registered users only until 19 September 2024.

Download (936kB) | Request a copy
[img] Text (BAB III)
18034010023_Bab3.pdf
Restricted to Registered users only until 19 September 2024.

Download (1MB) | Request a copy
[img] Text (BAB IV)
18034010023_Bab4.pdf
Restricted to Registered users only until 19 September 2024.

Download (1MB) | Request a copy
[img]
Preview
Text (BAB V)
18034010023_Bab5.pdf

Download (508kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
18034010023_Daftar_Pustaka.pdf

Download (475kB) | Preview
[img] Text (Lampiran)
18034010023_Lampiran.pdf
Restricted to Registered users only until 19 September 2024.

Download (9MB) | Request a copy

Abstract

The increase in the amount of waste coupled with the lack of waste management facilities, as well as the lack of knowledge and public awareness in managing waste causes the accumulation of waste to have an impact on environmental pollution. Based on observations, in the Kesamben sub-district, Jombang, there is no waste management facility so that people choose to do open burning, throw garbage on the side of the road, and even throw garbage directly into the river. From these problems, the purpose of this research is to determine the existing condition of waste management in Kesamben District, to find out the amount of generation and composition of waste and predictions for the next 5 years, and to determine the planning of the 3R Waste Processing Site in Kesamben District. The planned 3R Waste Processing Site in Kesamben District is predicted to be able to process waste for the next 5 years. The method of observation and distribution of questionnaires was carried out to determine the existing condition of waste management in Kesamben District. Meanwhile, to plan the 3R Waste Processing Site, some data are needed, namely population data and population projections, waste generation data, waste composition, waste generation projections, maps and area size, and HSPK for the Jombang Regency. Data on waste generation and composition were taken from waste sampling activities at residents' homes for 8 days based on SNI 19-3964-1994. The results of the sampling show that the solid waste generated is 0,1393 kg/person/day with a waste volume of 0,0022 m3/person/day. The composition of the waste consists of organic waste, plastic, paper, cloth/textile, glass, Styrofoam, and diapers. With the percentage of waste composition, respectively, namely 64,55%; 19,7%; 8,49%; 1,71%; 0,41%; 0,75%; and 4,38%. From this data, a 3R Waste Processing Site building is planned which can process waste up to a volume of 164,55 m3/day or the equivalent of 10.494,51 kg/day. The area of the planned 3R Waste Processing Site is 1338,25 m2 and consists of a reception room, sorting room, inorganic waste storage room, plastic waste processing unit, organic waste processing unit, liquid organic fertilizer storage room, residual waste storage room, and facilities. support. From the planning that has been done, it takes a budget plan of Rp.2.052.524.176,35.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPurnomo, Yayok SuryoNIDN0701066001yayoksp.tl@upnjatim.ac.id
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Nanda Henik Pratiwi
Date Deposited: 19 Sep 2022 06:40
Last Modified: 19 Sep 2022 06:40
URI: http://repository.upnjatim.ac.id/id/eprint/9108

Actions (login required)

View Item View Item